Park Cottage, Church End, Frampton, Boston PE20 1AH Data via plota.co.uk

B/25/0325 - Full Planning Permission Approved

Proposal

Siting of a Shepherd's Hut for use as holiday accommodation Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Aug 2025
✓
Consultation
5 Aug 2025
✓
Approved
26 Sept 2025

Approved on 26 Sept 2025 · Delegated Decision · Last checked 13 Oct 2026

Associated applications 2

Site constraints 8

Grade II listed: Park Cottages
List entry 1147573 · 7 m away · 4 more listed buildings within 150 m (4 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 4 with distances
Historic England ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Frampton conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Heritage at risk: Frampton
On the register of historic places assessed as at risk.
A designated building, monument, park or conservation area assessed as at risk from neglect, decay or development. Proposals that secure its future are looked on favourably.
Historic England ↗
Agricultural land, grade 1
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 516 m away: Outer Dowsing Offshore Wind (Generating Station)
The site is 516 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Traditional orchards
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Priority habitat 17 m away: Traditional orchard.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £550,000 in March 2019. Detached house, freehold.

7 March 2019£550,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in Boston - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Boston
Application type
Full Planning Permission
Postcode
PE20 1AH
Received
4 Aug 2025
Validated
4 Aug 2025
Ward
Kirton And Frampton Ward
Parish
Frampton
Case officer
Show
Target decision
29 Sept 2025
Decision
Approved
Decision date
26 Sept 2025
Decision level
Delegated Decision
Applicant
Show
Agent
Robert Doughty Consultancy Limited

How this decision compares

Decided in 53 days from validation, 7 days faster than Boston's median of 60 for full applications. Approved, as 92% of full applications here are.

42%decided within 8 weeks
92%approved
206decided in the last year

Plota live figures for full applications decided by Boston in the last twelve months, from validation. Boston decision record →

Public comments

No public comments yet.

136 neighbours consulted · Last counted 13 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14142824
Planning Portal ref
PP-14142824
Neighbours
5 Aug 2025
Consultation
5 Aug 2025
Comments by
4 Sept 2025
Site or press notice
13 Aug 2025
Statutory expiry
29 Sept 2025
Env. assessment
No