Former Gjf Fabrications, Lichfield Road, Brownhills, Walsall, WS8 6HR Data via plota.co.uk

26/0008 - Full Application Under Consultation and Assessment

Proposal

Full planning application for the retrospective subdivision of existing Blocks B,C,D,E,F,G, H and J to create 27 new units under a flexiable B2/B8 use class and the insertion of new windows, doors, cladding and shutters including rear ramp. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Jul 2026
Decision
Expected by 15 Oct 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 84.

The consultation period closed on 27 Aug 2026.

Site constraints 7

Air quality management area: Walsall AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Nature recovery project: Purple Horizons; Nature improvement area: Birmingham and the Black Country; SSSI about 394 m away: Chasewater And The Southern Staffordshire Coalfield Heaths SSSI; Coalfield, development low risk area; Inside the Brownhills built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Walsall - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Walsall
Application type
Full Application
Postcode
WS8 6HR
Received
17 Jul 2026
Validated
17 Jul 2026
Ward
Brownhills
Case officer
Show
Target decision
15 Oct 2026
Applicant
Show
Agent
Gurprit Benning

Decision outlook

Day 84, past the statutory target. 80% of commercial premises in Walsall are decided within thirteen weeks, which runs to 16 Oct 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 8 Oct 2026.

Day 8428 days past the 56-day target
40%decided within 8 weeks
73%approved
51decided in the last year

Plota live figures for commercial premises decided by Walsall in the last twelve months, from validation. Walsall decision record →

Consultation & key dates

Consultation
13 Aug 2026
Comments by
27 Aug 2026
Walsall
Planning Authority Score
2.1/10
Poor
#271 of 296 councils
Relevant to this application:
Major dwellings

Walsall is slower than most councils at deciding householder applications, ranking #228 out of 296. The council extends the time limit on 56% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Walsall decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #230 of 296
89%
Householder approved
Below avg (90%) #213 of 296
52%
Decided in 8 weeks
Below avg (63%) #228 of 296
56%
Extended time limit
Above avg (41%) #257 of 296
66%
Minor dwellings approved
95 decided (1-9 homes)
75%
Major dwellings approved
4 decided (10+ homes)
60%
Change of use approved
48 decided
800
Total decisions
128 refused in the year to March 2026