Church Hill House 5 Church Hill Reepham Norfolk NR10 4JL Data via plota.co.uk

2026/3373 - Listed Building Pending Consideration

Proposal

New French doors with side lights to Kitchen, opening up fire place between Dining and Kitchen, creation of artist studio with 6no. new conservation roof lights and apex window Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Nov 2026
✓
Validated
12 Nov 2026
✓
Consultation
16 Nov 2026
Decision
Expected by 7 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision around 6 Jan 2027, from South Norfolk Broadland's recent extensions.

Comments are open until 10 Dec 2026

Comment on this application ↗

Site constraints 9

Grade II listed: Post Office, House of Reverend Easton. Oakdene and Church Hill House
List entry 1342806 · 9 m away · 37 more listed buildings within 150 m (1 Grade I, 1 Grade II*, 35 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 37 with distances
Historic England ↗
Nutrient neutrality catchment: River Wensum SAC
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Reepham conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Article 4 direction
Area centred on the Market Place. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Public footpath 17 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project 813 m away: Norfolk Boreas
The site is 813 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Norfolk Vanguard (decided, 813 m); Hornsea Project Three Offshore Wind Farm (decided, 1 km).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Reepham (Broadland) built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 16 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Norfolk Broadland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building
Postcode
NR10 4JL
Received
11 Nov 2026
Validated
12 Nov 2026
Ward
Reepham
Parish
Reepham
Target decision
7 Jan 2027
Decision level
Schedule 2
Applicant
Show
Agent
Ground Designs

Decision outlook

Day 11 of the 56-day target. South Norfolk Broadland usually decides extensions by day 55.

Day 1145 days to the 56-day target
64%decided within 8 weeks
96%approved
802decided in the last year

Plota live figures for extensions decided by South Norfolk Broadland in the last twelve months, from validation. South Norfolk Broadland decision record →

Public comments

No public comments yet.

12 neighbours consulted · Last counted 16 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15363014
Planning Portal ref
PP-15363014
Neighbours
16 Nov 2026
Consultation
16 Nov 2026
Comments by
10 Dec 2026
Site or press notice
19 Nov 2026
Statutory expiry
7 Jan 2027
Env. assessment
No
South Norfolk Broadland
Planning Authority Score
5.9/10
Average
#106 of 296 overall
Relevant to this application:
Other decisions

South Norfolk Broadland is #136 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
South Norfolk Broadland decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #50 of 296
95%
Householder approved
Above avg (90%) #71 of 296
67%
Decided in 8 weeks
Above avg (63%) #136 of 296
42%
Extended time limit
Above avg (41%) #161 of 296
82%
Minor dwellings approved
137 decided (1-9 homes)
92%
Major dwellings approved
12 decided (10+ homes)
100%
Change of use approved
33 decided
1,013
Total decisions
67 refused in the year to March 2026