Buxbury Billet, Sutton Mandeville, SP3 5NL Data via plota.co.uk

PL/2026/03710 - Full planning permission Submitted

Proposal

Full planning permission for self-build detached dwelling, including hard and soft landscaping and associated works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
26 Jun 2026
Decision
Expected by 21 Aug 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 105.

The consultation period closed on 8 Sept 2026.

Documents 58

Plans & drawings 26

PDF Bird boxes elevations Additional · 21 Aug 2026 View ↗ PDF Billet proposed site plan Additional · 21 Aug 2026 View ↗ PDF Existing Site Plan with Parking Plan · 26 Jun 2026 View ↗ PDF Existing and Proposed Outlines Plan · 26 Jun 2026 View ↗ PDF Proposed Site Plan with Landscaping Plan · 26 Jun 2026 View ↗ PDF Location Plan Plan · 26 Jun 2026 View ↗ PDF Existing Site Plan with Parking Plan · 26 Jun 2026 View ↗ PDF Existing and Proposed Outlines Plan · 26 Jun 2026 View ↗ PDF Proposed Site Plan with Landscaping Plan · 26 Jun 2026 View ↗ PDF Location Plan Plan · 26 Jun 2026 View ↗ PDF Bat Mitigation Plan Plan · 11 Jun 2026 View ↗ PDF Proposed Site Plan Plan · 11 Jun 2026 View ↗ PDF Proposed Sections Plan · 11 Jun 2026 View ↗ PDF Proposed Floor Plans and Elevations Plan · 11 Jun 2026 View ↗ PDF Current Site Plan and Existing Services Plan · 11 Jun 2026 View ↗ PDF Existing Floor Plans and Elevation Plan · 11 Jun 2026 View ↗ PDF Proposed Lighting Plan Plan · 11 Jun 2026 View ↗ PDF Existing Site Plan + Photos Plan · 11 Jun 2026 View ↗ PDF Bat Mitigation Plan Plan · 11 Jun 2026 View ↗ PDF Proposed Site Plan Plan · 11 Jun 2026 View ↗ PDF Current Site Plan and Existing Services Plan · 11 Jun 2026 View ↗ PDF Existing Floor Plans and Elevation Plan · 11 Jun 2026 View ↗ PDF Proposed Sections Plan · 11 Jun 2026 View ↗ PDF Proposed Floor Plans and Elevations Plan · 11 Jun 2026 View ↗ PDF Proposed Lighting Plan Plan · 11 Jun 2026 View ↗ PDF Existing Site Plan + Photos Plan · 11 Jun 2026 View ↗

All documents on the council site ↗

Site constraints 5

Nutrient neutrality catchment: River Avon SAC
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Cranborne Chase & West Wiltshire Downs National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Wiltshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Wiltshire
Application type
Full planning permission
Postcode
SP3 5NL
Received
26 Jun 2026
Validated
26 Jun 2026
Ward
Fovant & Chalke Valley ED
Parish
Sutton Mandeville CP
Case officer
Show
Target decision
21 Aug 2026

Decision outlook

Day 105, past the statutory target. 68% of new homes in Wiltshire are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 7 Oct 2026.

Day 10549 days past the 56-day target
37%decided within 8 weeks
70%approved
189decided in the last year

Plota live figures for new homes decided by Wiltshire in the last twelve months, from validation. Wiltshire decision record →

Public comments

12comments received
1 objecting8 neutral3 supporting

25% support · above the UK average of 16%

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
8 Sept 2026
Wiltshire
Planning Authority Score
3.9/10
Below average
#203 of 296 councils
Relevant to this application:
Householder decisions

Wiltshire is slower than most councils at deciding householder applications, ranking #225 out of 296. The council extends the time limit on 55% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Wiltshire decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #71 of 296
96%
Householder approved
Above avg (90%) #65 of 296
53%
Decided in 8 weeks
Below avg (63%) #225 of 296
55%
Extended time limit
Above avg (41%) #252 of 296
78%
Minor dwellings approved
339 decided (1-9 homes)
90%
Major dwellings approved
48 decided (10+ homes)
92%
Change of use approved
160 decided
3,659
Total decisions
256 refused in the year to March 2026