Land At Godfrey Drive Winthorpe Data via plota.co.uk

26/00483/RMAM - Reserved Matters Major Approved

Proposal

Reserved Matters Planning application for the erection of a cold storage distribution centre with ancillary offices, parking, transport links and associated infrastructure. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
30 Mar 2026
✓
Validated
31 Mar 2026
✓
Consultation
30 Jul 2026
✓
Approved
25 Sept 2026

Approved on 25 Sept 2026 · Delegated Officer · Last checked 25 Sept 2026

Documents 29

All documents on the council site ↗

Site constraints 3

Public footpath 1 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
National infrastructure project 45 m away: A46 Newark Bypass
The site is 45 m from the project boundary. Highway, decided. The project page says whether consent was granted. Also within 2 km: H2East Pipeline: Humber to Nottinghamshire (at pre-application, 1.4 km).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Looking for land for a warehouse?

Plota Sites searches every land parcel in England and Wales: 11,482 sites fit this search. On and off the market, free to search.

Land for big warehouses
Work with planning data?

Every application in Newark and Sherwood - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Reserved Matters Major
Received
30 Mar 2026
Validated
31 Mar 2026
Ward
Collingham
Parish
Winthorpe
Case officer
Show
Target decision
30 Jun 2026
Decision
Application Permitted
Decision date
25 Sept 2026
Decision level
Delegated Officer
Applicant
Show
Agent
Lindum Group - Mr Robert Jays

How this decision compares

Decided in 178 days from validation, 113 days slower than Newark and Sherwood's median of 65 for commercial and major works. Approved, as 100% of commercial and major works here are.

43%decided within 8 weeks
100%approved
43decided in the last year

Plota live figures for commercial and major works decided by Newark and Sherwood in the last twelve months, from validation. Newark and Sherwood decision record →

Public comments

No public comments yet.

12 neighbours consulted · Last counted 25 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14802101
Planning Portal ref
PP-14802101
Consultation
30 Jul 2026
Statutory expiry
30 Jun 2026
Env. assessment
No
Newark and Sherwood
Planning Authority Score
3.9/10
Below average
#198 of 296 overall
Relevant to this application:
Major dwellings

Newark and Sherwood is slower than most councils at deciding householder applications: #241 of 296 on speed. 54% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Newark and Sherwood decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #88 of 296
96%
Householder approved
Above avg (90%) #55 of 296
50%
Decided in 8 weeks
Below avg (63%) #241 of 296
54%
Extended time limit
Above avg (41%) #244 of 296
80%
Minor dwellings approved
110 decided (1-9 homes)
88%
Major dwellings approved
25 decided (10+ homes)
82%
Change of use approved
33 decided
767
Total decisions
63 refused in the year to March 2026