Littlehampton Southern Allotments and Land West of Holly Drive Littlehampton BN17 7PP Data via plota.co.uk

LU/174/25/AOO Approved

Proposal

Application for the approval of the Ecology scheme in relation to the Southern Allotments () under Schedule 16, Part 1 in the Section 106 agreement dated 23/01/13 (as amended) in relation to planning permission (as amended by & ). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
21 Aug 2025
✓
Approved
19 Sept 2025

Approved on 19 Sept 2025 · Last checked 13 Oct 2026

Associated applications 6

Site constraints 5

National infrastructure project about 668 m away: Rampion 2 Offshore Wind Farm
The site is about 668 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
2 listed buildings within 150 m of the postcode pin; Radon affected area, class 2; Inside the Toddington (Arun) built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 1, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Arun - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Arun
Postcode
BN17 7PP
Received
21 Aug 2025
Validated
21 Aug 2025
Parish
Littlehampton
Case officer
Show
Target decision
16 Oct 2025
Decision
Approve
Decision date
19 Sept 2025
Applicant
Show
Agent
Persimmon Homes Persimmon House Knoll Road Camberley GU15 3TQ

How this decision compares

Decided in 29 days from validation, 32 days faster than Arun's median of 61 for full applications. Approved, as 86% of full applications here are.

34%decided within 8 weeks
86%approved
340decided in the last year

Plota live figures for full applications decided by Arun in the last twelve months, from validation. Arun decision record →

Arun
Planning Authority Score
8.9/10
Excellent
#4 of 296 councils
Relevant to this application:
Householder decisions

Arun is one of the fastest councils in England for householder decisions, ranking #2 out of 296. Only 12% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Arun decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #187 of 296
94%
Householder approved
Above avg (90%) #97 of 296
99%
Decided in 8 weeks
Above avg (63%) #2 of 296
12%
Extended time limit
Below avg (41%) #4 of 296
45%
Minor dwellings approved
66 decided (1-9 homes)
75%
Major dwellings approved
20 decided (10+ homes)
86%
Change of use approved
35 decided
794
Total decisions
113 refused in the year to March 2026