Farnborough Airport Farnborough Road, Farnborough, GU14 6XA Data via plota.co.uk

EHDC-25-1357-NAC - Neighbouring Authority Consultation Neighbouring Authority Cons - Obj

Proposal

Consultation from Rushmoor Borough Council - Variation of Conditions 2 (aircraft movements) and 6 (aircraft weight), and replacement of Conditions 7 (1:10,000 risk contour) and 8 (1:100,00 risk contour), of planning permission determined on the 22/02/2022, in order to: a) increase the number of non-weekday aircraft movements from 8,900 to 13,500 per annum, and b) amend the permitted annual flight movements weight category from 50,000-80,000 kg to 55,000-80,000 kg, retaining the overall cap of 1,500 movements (within this cap: aircraft between 50,000-55,000 kg that do not meet ICAO Chapter 14 (or equivalent) noise standards shall continue to be counted, and non-weekday movements within the revised category shall increase from 270 to 405), and to c) replace Conditions Nos. 7 (1:10,000 risk contour) and 8 (1:100,000 risk contour) with a new condition to produce Public Safety Zone maps in accordance with the Department for Transport Requirements at Farnborough Airport Farnborough Road Farnborough Hampshire GU14 6XA GRID REF: 153909 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
24 Nov 2025
Decision
Target date was 15 Dec 2025

Under consideration

No decision has been issued yet. The council's target date, 15 Dec 2025, has passed.

The consultation period closed on 16 Dec 2025.

Site constraints 4

Priority habitat: Lowland dry acid grassland
A habitat of principal importance. It shapes the ecology work and the biodiversity net gain a scheme has to show.
Habitat network: Lowland dry acid grassland
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project 985 m away: Southampton to London Pipeline Project
The site is 985 m from the project boundary. Pipeline, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Farnborough built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 9 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Hampshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Neighbouring Authority Consultation
Postcode
GU14 6XA
Received
24 Nov 2025
Validated
24 Nov 2025
Case officer
Show
Target decision
15 Dec 2025
Decision level
Delegated
Applicant
Show

Consultation & key dates

Comments by
16 Dec 2025
Statutory expiry
15 Dec 2025
East Hampshire
Planning Authority Score
1.5/10
Poor
#282 of 296 overall
Relevant to this application:
Householder decisions

East Hampshire is one of the slowest councils in England for householder decisions: #293 of 296 on speed. The council extends the time limit on 72% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Hampshire decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #153 of 296
91%
Householder approved
Above avg (90%) #173 of 296
24%
Decided in 8 weeks
Below avg (63%) #293 of 296
72%
Extended time limit
Above avg (41%) #288 of 296
63%
Minor dwellings approved
72 decided (1-9 homes)
78%
Major dwellings approved
9 decided (10+ homes)
88%
Change of use approved
24 decided
606
Total decisions
72 refused in the year to March 2026