Jubilee Central Church 62-64 King Edward Street Kingston Upon Hull HU1 3SQ Data via plota.co.uk

25/01087/S19 - Listed Building vary a condition Approved

Proposal

Variation of condition of approval ref 25/00728/S19 Condition 1 (approved plans) to revise the position of new internal staircase from the position shown on the approved drawings. Application under Section 19 of the Town and Country Planning Act 1990 (as amended); Planning (Listed Buildings and Conservation Areas Act) 1990 (as amended) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
26 Nov 2025
✓
Approved
21 Jan 2026

Approved on 21 Jan 2026 · Delegated Decision · Last checked 8 Oct 2026

Associated applications 3

Site constraints 5

Grade II listed: 46, 48 and 50, King Edward Street
List entry 1210124 · The pin is inside its outline · 25 more listed buildings within 150 m (25 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 25 with distances
Historic England ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Paragon conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
National infrastructure project 213 m away: A63 Castle Street Improvement-Hull
The site is 213 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Kingston upon Hull built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area96 m² (1,033 sq ft)
Energy ratingC (asset rating 54)
UseRetail/Financial and Professional Services
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in July 2024, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Hull - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hull
Application type
Listed Building vary a condition
Postcode
HU1 3SQ
Received
26 Nov 2025
Validated
26 Nov 2025
Ward
St Andrews And Dockland
Case officer
Show
Decision
Listed Building Consent Approved
Decision date
21 Jan 2026
Decision level
Delegated Decision
Agent
SALT Architects

Public comments

No public comments yet.

15 neighbours consulted · Last counted 8 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14516418
Planning Portal ref
PP-14516418
Comments by
7 Jan 2026
Env. assessment
No
Hull
Planning Authority Score
2.6/10
Poor
#248 of 296 councils
Relevant to this application:
Other decisions

Hull is slower than most councils at deciding householder applications, ranking #231 out of 296. The council extends the time limit on 62% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Hull decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #85 of 296
92%
Householder approved
Above avg (90%) #156 of 296
51%
Decided in 8 weeks
Below avg (63%) #231 of 296
62%
Extended time limit
Above avg (41%) #273 of 296
88%
Minor dwellings approved
16 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
88%
Change of use approved
33 decided
436
Total decisions
36 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.