Anaerobic digestion expansion at Swancote Energy Ltd Anaerobic Digestion Plant At Swancote Farm Swancote Bridgnorth

Summary of planning committee decision

Decided by Shropshire Southern Planning Committee on 26 May 2026.

25/02645/VARApproved

What was proposed

The application sought to increase annual feedstock throughput from 70,000 to 120,000 tonnes and change the feedstock to waste, liquid materials and farm manures.

“Proposal: Variation of Condition 3 (revised access proposals), Condition 9 (feedstock type) and Condition 10A (feedstock allowance) attached to permission 10/03881/MAW dated 20 December 2010”

“The application seeks to vary existing planning conditions to increase the permitted feedstock throughput at an established Anaerobic Digestion (AD) facility at Swancote Farm from 70,000 to 120,000 tonnes per annum. The proposal involves a transition away from energy crops (such as maize), with all feedstock proposed to be derived from non-agricultural food waste, liquid wastes and farm manures. The only built development proposed relates to access improvement works.”

Officer report

The site and surroundings

The established facility lies at a farm about two kilometres east of Bridgnorth, accessed from the A454, with nearby residences around the site.

“Swancote Farm is situated some 2 kilometres to the east of Bridgnorth, to the south of the A454 highway at Swancote. Access to the site is off the A454 highway via a private drive. The existing site provides parking and manoeuvring space in the existing concrete yard area.”

“There are a number of residences in the area around Swancote Farm, the closest of which that are not associated with the AD facility are residences along the A454 to the north, the closest of which is approximately 160 m distant, with Firs Croft approximately 200 m to the north and Swancote Rise approximately 230 m to the north-east of the AD.”

Officer report

Planning history

The facility and its infrastructure have been covered by several earlier permissions, including permissions for increased feedstock capacity, storage and additional anaerobic digestion infrastructure.

“Construction of an on-farm agricultural anaerobic digestion plant to generate renewable energy DISAPP 18th April 2011 11/03477/AGR Construction of a silage clamp and improvements to existing agricultural access track PNAGR 22nd August 2011 11/05166/FUL Erection of office extension GRANT 6th February 2012 12/01455/MAW Change of use of existing agricultural building to provide a feedstock storage facility and siting of a combined heat and power generator GRANT 23rd May 2012…”

“13/01181/MAW Change of use and increase in height of agricultural building at Swancote Farm to allow the reception and temporary storage of waste to be used as feedstock in the Swancote Energy anaerobic digestion plant.”

Officer report

What officers recommended

Officers recommended approval because the proposal was considered unlikely to cause unacceptable environmental or highway impacts and would accord with planning policies subject to conditions.

“The assessment of environmental effects as a result of the likely emissions from the development demonstrates that the proposal is unlikely give rise to unacceptable adverse impacts, either individually or cumulatively, when considered against the existing baseline and regulatory controls in place.”

“Taking all matters into account, the development is considered to accord with the relevant policies of the Development Plan and the National Planning Policy Framework, and there are no material considerations which would warrant refusal of the application, subject to the imposition of appropriate planning conditions.”

Officer report

Consultation responses

Statutory consultees raised no objection or adverse comment, while highways officers supported the access works but requested highway safety mitigation.

“Executive Summary It is considered that the proposals would have a negligible impact on the highway network. Whilst SC considers the proposals acceptable in principle, further mitigation is requested to improve highway safety, as outlined in this note.”

“It is noted that for the approved application (15/01864/FUL) which permits a throughput of 70,000 tonnes, concerns were raised with regards to accidents within the vicinity of the site. It is understood that discussions took place about the possibility of introducing localised traffic calming measures, to include the extension of the existing double white lines and a review of signing along the A454. It is unclear whether these works were undertaken.”

Officer report

Concerns raised

The parish council and residents raised concerns about emissions, odour, traffic, noise, intensification, planning procedure, site definition and countryside impacts.

“Increase in scale and impacts • Significant increase in imported feedstock (up to 120,000 tonnes, potentially ~165,000 tonnes cumulatively). • Introduction of additional waste streams, including chicken manure. • Likely to result in increased odour, traffic, noise, and light pollution, worsening existing issues experienced by nearby residents. Existing amenity concerns • Current operations already cause persistent odour nuisance, traffic and noise impacts.”

“Seen as an attempt to retrospectively regularise a fundamentally different scheme. Need for a full planning application • Strong view that proposals should be subject to a new, full planning application. • Current approach prevents proper assessment of the whole operation and cumulative impacts. • Lack of clarity and transparency in the submitted application (e.g. inconsistencies in conditions being varied, missing plans).”

Officer report

Who spoke

A solicitor read a statement against the proposal, and a representative for the applicant spoke in support.

What members discussed

Members noted the absence of statutory consultee objections and welcomed the proposed removal of energy crops from the plant.

“Members acknowledged that there were no objections for statutory consultees and welcomed the fact that energy crops would no longer be used in the plant.”

Minutes

The committee’s decision

The committee resolved to grant permission subject to the listed conditions, with officers authorised to review and reattach the earlier conditions as appropriate.

“That in accordance with Officer recommendation planning permission be granted subject to the conditions set out in Appendix 1 with delegation to officers to review the conditions attached to 10/03881/MAW and redraft and reattach to the consent as appropriate.”

Minutes

Councillors at the meeting

Apologies Chris Naylor Lib Dem

Source: Plota analysis of the council's minutes; parties from the council's list of councillors.

Sources

  • Shropshire Southern Planning Committee minutes, 26 May 2026
  • Agenda and papers (council website)

Source: Plota analysis of Shropshire's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.

Committee decisions and nationwide planning applications, in one API

The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.

See the API →

At the meeting

Council
Shropshire
Date
Tuesday 26 May 2026
Recommendation
Officers recommended approval
Committee decided
Approved
Councillors
10Lib Dem 5Conservative 2Reform UK 2Independent 1Show councillors
Minutes
The council's minutes
Meeting
Agenda and papers (council website)

This committee's year

10 decisions in the 12 months to this meeting, 2 against officer advice.

Source: Plota analysis of the committee's minutes.

Every decision by this council's committees →