1 Kendal Drive East Boldon NE36 0UB Data via plota.co.uk

250210 - Full Planning Permission Approved

Proposal

Proposed rear extension. Change of use from open land area to rear garden, including new boundary treatment. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
26 Mar 2025
✓
Validated
16 Dec 2025
✓
Approved
6 Feb 2026

Approved on 6 Feb 2026 · Last checked 3 Oct 2026

Associated applications 2

Site constraints 7

Public bridleway 19 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Also on the record
Conservation area 32 m away: East Boldon; Radon affected area, class 2; 4 listed buildings within 150 m; Heritage at risk 32 m away: East Boldon, South Tyneside; Coalfield, development low risk area; Inside the East Boldon and West Boldon built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £400,000 in February 2026. Detached house, leasehold.

More than one property is recorded at this address: HM Land Registry does not always give the flat or unit.

6 February 2026£400,000
15 July 2005£248,000Flat or maisonette

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area132 m² (1,421 sq ft)
Energy ratingD (63 out of 100), could reach C
PropertyDetached house, 6 habitable rooms
Built1991 to 1995
HeatingBoiler and radiators, mains gas
WallsCavity wall, as built, insulated (assumed)

From the energy performance certificate lodged in July 2022, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in South Tyneside - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
NE36 0UB
Received
26 Mar 2025
Validated
16 Dec 2025
Ward
Cleadon Village and East Boldon
Case officer
Show
Decision
Grant Permission with Conditions
Decision date
6 Feb 2026
Applicant
Show
Agent
Robinson Brown Design

How this decision compares

Decided in 52 days from validation, 18 days faster than South Tyneside's median of 70 for full applications. Approved, as 90% of full applications here are.

39%decided within 8 weeks
90%approved
128decided in the last year

Plota live figures for full applications decided by South Tyneside in the last twelve months, from validation. South Tyneside decision record →

Consultation & key dates

Comments by
13 Jan 2026
South Tyneside
Planning Authority Score
5.9/10
Average
#108 of 296 overall
Relevant to this application:
Change of use

South Tyneside is #154 of 296 councils on householder decision speed. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.

More permissive than most councils
98% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
South Tyneside decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #92 of 296
98%
Householder approved
Above avg (90%) #24 of 296
64%
Decided in 8 weeks
Above avg (63%) #154 of 296
44%
Extended time limit
Above avg (41%) #186 of 296
88%
Minor dwellings approved
8 decided (1-9 homes)
75%
Major dwellings approved
4 decided (10+ homes)
58%
Change of use approved
48 decided
396
Total decisions
32 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.