465-467 Bethnal Green Road, London, E2 9QH Data via plota.co.uk

PA/25/01691/NC - Advertisement Consent Approved

Proposal

Display of x3 non illuminated fascia signs. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 7 Oct 2025
✓
Consultation
14 Oct 2025
✓
Approved
21 Nov 2025

Approved on 21 Nov 2025 · Delegated · Last checked 2 Nov 2026

Site constraints 12

Article 4 direction
Bethnal Green. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area: Tower Hamlets APA 2.4
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Bethnal Green
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Registered park or garden 95 m away: Bethnal Green Gardens
Its setting is a consideration for work nearby.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
16 listed buildings within 150 m; Wider setting of protected view 9A.1 King Henry's Mound to St Paul's Cathedral; National infrastructure project 1.4 km away: Thames Tideway Tunnel; Conservation area 75 m away: Bethnal Green Gardens; Inside the Tower Hamlets built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Advertisement Consent
Postcode
E2 9QH
Received
around 7 Oct 2025
Validated
7 Oct 2025
Ward
Bethnal Green West
Case officer
Show
Target decision
2 Dec 2025
Decision
Permit
Decision date
21 Nov 2025
Decision level
Delegated
Applicant
Show
Agent
LYONDALE
Freehold owner
Show

How this decision compares

Decided in 45 days from validation, 11 days faster than Tower Hamlets's median of 56 for advertisement consent. Approved, as 86% of advertisement consent here are.

65%decided within 8 weeks
86%approved
111decided in the last year

Plota live figures for advertisement consent decided by Tower Hamlets in the last twelve months, from validation. Tower Hamlets decision record →

Consultation & key dates

Comments by
4 Nov 2025
Site or press notice
14 Oct 2025
Statutory expiry
2 Dec 2025
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 overall
Relevant to this application:
Other decisions

Tower Hamlets is slower than most councils at deciding householder applications: #207 of 296 on speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026

Freehold owner and leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.