Orbital Industrial Estate Horton Road Yiewsley UB7 8JL Data via plota.co.uk

79689/APP/2025/2438 Approved at committee

Approved at planning committee on 6 October 2026. The council has not issued its decision notice yet.

Proposal

Demolition of existing buildings and structures and redevelopment of the site to provide modern employment units (for flexible use across classes E(g)(iii), B2, B8 with ancillary office space) alongside car parking, service yards, landscaping, ancillary structures and all other associated works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Sept 2025
✓
Committee
6 Oct 2026
Decision notice
Not issued yet

Under consideration

No decision has been issued yet. Plota predicted a decision around 18 Nov 2026; it is now day 426.

The consultation period closed on 1 Apr 2026.

Planning committee

Decided by Hillingdon Planning Committee on 6 Oct 2026. The council has not yet issued its decision notice.

Approved unanimously

As officers recommended.

  • Officers advised approval because the redevelopment was acceptable in design, amenity, environmental, transport and sustainability terms, subject to conditions and obligations.
  • No public representations were received, while consultees raised no objections subject to conditions, informatives or contributions.
  • The committee unanimously approved the application subject to the report’s conditions.
Read how the committee decided The proposed redevelopment, officers’ assessment, consultation responses, committee discussion, vote and decision.

Source: Plota analysis of Hillingdon's committee minutes of 6 Oct 2026.

Site constraints 6

3 Article 4 directions
Residential extensions · Construction of new dwellinghouses in employment areas · Changes of use from commercial, business and service uses to dwellinghouses. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Strategic industrial land
Reserved for industry and logistics.
The London Plan protects strategic industrial locations from other uses; release needs a plan-led process.
Air quality management area: Hillingdon AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
National infrastructure project about 1442 m away: M4 Junctions 3 to 12 Smart Motorway; Inside the Hillingdon built-up area; Public transport access: PTAL 1b (very poor), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hillingdon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hillingdon
Postcode
UB7 8JL
Received
18 Sept 2025
Validated
18 Sept 2025
Ward
YIEWSLEY 2022
Case officer
Show
Target decision
30 Nov 2026
Agent
Sophie King

Decision outlook

Day 426, past the statutory target. 73% of full applications in Hillingdon are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 17 Nov 2026.

Day 426370 days past the 56-day target
37%decided within 8 weeks
88%approved
1,425decided in the last year

Plota live figures for full applications decided by Hillingdon in the last twelve months, from validation. Hillingdon decision record →

Consultation & key dates

Consultation
22 Oct 2025
Comments by
1 Apr 2026
Hillingdon
Planning Authority Score
3.5/10
Below average
#219 of 296 councils
Relevant to this application:
Householder decisions

Hillingdon ranks #194 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Hillingdon decision statistics
Based on MHCLG data, the year to March 2026
85%
Overall approval rate
Below avg (87%) #208 of 296
90%
Householder approved
Above avg (90%) #191 of 296
58%
Decided in 8 weeks
Below avg (63%) #194 of 296
45%
Extended time limit
Above avg (41%) #190 of 296
61%
Minor dwellings approved
67 decided (1-9 homes)
65%
Change of use approved
17 decided
1,680
Total decisions
255 refused in the year to March 2026