, Low Lane, Rockland All Saints, Rocklands, Norfolk, NR17 1TU Data via plota.co.uk

PL/2026/1096/SU37 - SU37 Application under section 37 The Electricity Works (EIA) Regulations 2017 No objections

Proposal

Installation of a third high voltage overhead line and existing pole to be reconfigured to allow for the third phase Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
10 Aug 2026
Decision
Target date was 21 Sept 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 23 Nov 2026, from Breckland's recent utility and infrastructure works.

Site constraints 3

Priority habitat: Lowland fens
A habitat of principal importance. It shapes the ecology work and the biodiversity net gain a scheme has to show.
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Lowland fens
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Breckland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Breckland
Application type
SU37 Application under section 37 The Electricity Works (EIA) Regulations 2017
Postcode
NR17 1TU
Received
10 Aug 2026
Validated
10 Aug 2026
Ward
All Saints and Wayland
Parish
Rocklands
Case officer
Show
Target decision
21 Sept 2026
Decision level
Delegated decision
Applicant
Show
Agent
Fisher German

Decision outlook

Day 105, past the statutory target. 57% of utility and infrastructure works in Breckland are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 19 Nov 2026.

Day 10549 days past the 56-day target
38%decided within 8 weeks
95%approved
41decided in the last year

Plota live figures for utility and infrastructure works decided by Breckland in the last twelve months, from validation. Breckland decision record →

Consultation & key dates

Statutory expiry
21 Sept 2026
Breckland
Planning Authority Score
8.6/10
Excellent
#14 of 296 overall
Relevant to this application:
Householder decisions

Breckland is faster than most councils at deciding householder applications: #32 of 296 on speed. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.

More permissive than most councils
98% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Breckland decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #216 of 296
98%
Householder approved
Above avg (90%) #12 of 296
81%
Decided in 8 weeks
Above avg (63%) #32 of 296
34%
Extended time limit
Below avg (41%) #84 of 296
54%
Minor dwellings approved
178 decided (1-9 homes)
88%
Major dwellings approved
17 decided (10+ homes)
801
Total decisions
128 refused in the year to March 2026