1 Alma Villas, St Leonards-on-sea, TN37 6QU Data via plota.co.uk

HS/TP/25/00456 - Tree Preservation Order - works related Approved

Proposal

1x London Plane - Reduce crown by 4 linear metres Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
25 Jul 2025
✓
Consultation
12 Aug 2025
✓
Approved
12 Sept 2025

Approved on 12 Sept 2025 · DELEGATED · Last checked 1 Nov 2026

Site constraints 3

Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Local nature reserve 413 m away: Old Roar Gill & Coronation Wood; Inside the Hastings built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area42 m² (452 sq ft)
Energy ratingC (70 out of 100)
PropertySemi-detached flat, 2 habitable rooms
Built1983 to 1990
HeatingElectric storage heaters
WallsCavity wall, as built, insulated (assumed)

From the energy performance certificate lodged in June 2013, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Hastings - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hastings
Application type
Tree Preservation Order - works related
Postcode
TN37 6QU
Received
25 Jul 2025
Validated
25 Jul 2025
Ward
SILVERHILL
Case officer
Show
Target decision
19 Sept 2025
Decision
GRANTED PERMISSION
Decision date
12 Sept 2025
Decision level
DELEGATED
Applicant
Show

How this decision compares

Decided in 49 days from validation, about the council's usual 48 days. Approved, as 86% of tree works here are.

85%decided within 8 weeks
86%approved
61decided in the last year

Plota live figures for tree works decided by Hastings in the last twelve months, from validation. Hastings decision record →

Public comments

No public comments yet.

Last counted 1 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
12 Aug 2025
Site or press notice
19 Aug 2025
Statutory expiry
19 Sept 2025
Hastings
Planning Authority Score
3.8/10
Below average
#206 of 296 overall
Relevant to this application:
Householder decisions

Hastings is #139 of 296 councils on householder decision speed. 50% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Hastings decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #172 of 296
90%
Householder approved
Above avg (90%) #190 of 296
67%
Decided in 8 weeks
Above avg (63%) #139 of 296
50%
Extended time limit
Above avg (41%) #224 of 296
73%
Minor dwellings approved
49 decided (1-9 homes)
100%
Major dwellings approved
7 decided (10+ homes)
76%
Change of use approved
25 decided
338
Total decisions
44 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.