The Green, Ravenstonedale, Kirkby Stephen, (GR:372726,502422), CA17 4NW Data via plota.co.uk

E/12/146/OH Approved

Proposal

Notification under Reg 5 of the Overhead Lines (Exemption) Regulations 2009 to replace 3 poles within an existing line and install one additional pole (Ref LRC/EM/N-4497) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
24 Jun 2026
✓
Validated
25 Jun 2026
✓
Approved
31 Jul 2026

Approved on 31 Jul 2026 · Delegated · Last checked 31 Jul 2026

Site constraints 12

Article 4 directionUpper Eden Neighbourhood PlanDark Skies ReserveNN Catchment-River EdenEden Westmorland_Advert_Control
Nutrient neutrality catchment: River Eden SAC
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Yorkshire Dales National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Agricultural land, grade 4
Poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 5. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Other Priority Habitats - NEZ
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Article 4 directionCouncil record
Some permitted development rights are withdrawn. The direction is on the council's register but not published as open data.
Council site ↗
Upper Eden Neighbourhood PlanCouncil record
Recorded by the council for this site.
Council site ↗
Dark Skies ReserveCouncil record
Recorded by the council for this site.
Council site ↗
NN Catchment-River EdenCouncil record
Recorded by the council for this site.
Council site ↗
Eden Westmorland_Advert_ControlCouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
Radon affected area, class 2; Priority habitat about 15 m away: Deciduous woodland; Open access land about 8 m away: Access Land - Combined Open Country, Registered Common Land and Section 16 Dedicated Land.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Yorkshire Dales - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Postcode
CA17 4NW
Received
24 Jun 2026
Validated
25 Jun 2026
Parish
Ravenstonedale
Case officer
Show
Target decision
5 Aug 2026
Decision
Approved - No Objection
Decision date
31 Jul 2026
Decision level
Delegated
Applicant
Show

How this decision compares

Decided in 36 days from validation, 15 days faster than Yorkshire Dales's median of 51 for utility and infrastructure works. Approved, as 100% of utility and infrastructure works here are.

62%decided within 8 weeks
100%approved
26decided in the last year

Plota live figures for utility and infrastructure works decided by Yorkshire Dales in the last twelve months, from validation. Yorkshire Dales decision record →