Land At Manor Farm Chapel Street Hambleton North Yorkshire Data via plota.co.uk

SELZG2026/0316/DOC - Discharge of Conditions Decided

Proposal

Discharge of conditions 5 (CEMP), 6 (phasing plan), 10 (highways), 11 (highways) and 12 (highways) of approval Outline application with all matters reserved except for means of access to, but not within, the site for the development of circa 156 dwellings and associated landscaping and infrastructure works (allowed on appeal APP/) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Apr 2026
✓
Consultation
8 Apr 2026
✓
Part confirmation of discharge of conds
13 May 2026

Part confirmation of discharge of conds on 13 May 2026 · Delegated Decision · Last checked 26 Sept 2026

Associated applications 2

  • Part of

    OutlineApprovedcouncil archive

    Conditions 5, 6, 10, 11, 12 decided (outcome not recorded)

    • ConditionsDischarge of conditions 5 (CEMP), 6 (phasing plan), 10 (highways), 11 (highways) and 12…This applicationSELZG2026/0316/DOC

Site constraints 4

Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 311 m away: Light Valley Solar
The site is 311 m from the project boundary. Generating station, under examination. Also within 2 km: Knottingley Power Project (decided, 1335 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Coalfield, development low risk area; 1 listed building within 150 m.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Selby - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Selby
Application type
Discharge of Conditions
Postcode
YO8 9JE
Received
2 Apr 2026
Validated
2 Apr 2026
Ward
Thorpe Willoughby & Hambleton
Parish
Hambleton
Case officer
Show
Target decision
28 May 2026
Decision
Part confirmation of discharge of conds
Decision date
13 May 2026
Decision level
Delegated Decision
Applicant
Show

Public comments

No public comments yet.

Last counted 26 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14829374
Planning Portal ref
PP-14829374
Consultation
8 Apr 2026
Comments by
29 Apr 2026
Statutory expiry
28 May 2026
Env. assessment
No