Flats 57 to 71, Durward Street, London E1 5BT Data via plota.co.uk

PA/26/01600/NC - Full Planning Permission Registered

Proposal

Replacement of existing timber casement windows to all flats and elevations with new double glazed white coloured Upvc casement windows of same sizes and styles as existing. Replacement of existing front and rear timber communal entrance doors and communal stairwell windows with double glazed white powder coated aluminium entrance doors and casement windows. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 16 Sept 2026
✓
Consultation
25 Sept 2026
Decision
Expected by 25 Nov 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 68.

The consultation period closed on 19 Oct 2026.

Site constraints 10

Archaeological priority area: Tower Hamlets APA 2.9
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
9 listed buildings within 150 m of the postcode pin
Nearest: Parish Boundary Marker Parish Boundary Marker at Corner With Fulbourne Street, Grade II, about 32 m from the postcode pin · 8 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 9 with distances
Historic England ↗
Conservation area about 10 m away: Whitechapel Market
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
National infrastructure project about 851 m away: Thames Tideway Tunnel
The site is about 851 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, about 1.3 km).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Tower Hamlets built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Town centre about 56 m away: Whitechapel; Designated open space about 41 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
E1 5BT
Received
around 16 Sept 2026
Validated
16 Sept 2026
Ward
Spitalfields and Banglatown
Case officer
Show
Target decision
25 Nov 2026
Decision level
Delegated
Applicant
Show
Agent
M.A. Newsome & Co Ltd

Decision outlook

Day 68, past the statutory target. 88% of extensions in Tower Hamlets are decided within thirteen weeks, which runs to 16 Dec 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.

Day 6812 days past the 56-day target
66%decided within 8 weeks
90%approved
402decided in the last year

Plota live figures for extensions decided by Tower Hamlets in the last twelve months, from validation. Tower Hamlets decision record →

Consultation & key dates

Neighbours
25 Sept 2026
Consultation
25 Sept 2026
Comments by
19 Oct 2026
Site or press notice
28 Sept 2026
Statutory expiry
11 Nov 2026
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 overall
Relevant to this application:
Householder decisions

Tower Hamlets is slower than most councils at deciding householder applications: #207 of 296 on speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026