87, Balmoral Drive, Willenhall, WV12 5TH Data via plota.co.uk

26/0847 - Full Application Under Consultation and Assessment

Proposal

Full planning application for a two storey side and rear extension, first floor front extension, single storey front extension, single storey rear extension and new porch. (Affects PROW Will32). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
12 Aug 2026
Decision
Expected by 7 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision by 17 Oct 2026, from Walsall's recent extensions.

The consultation period closed on 1 Oct 2026.

Site constraints 5

Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment.
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
Air quality management area: Walsall AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Public footpath about 27 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Also on the record
Nature improvement area: Birmingham and the Black Country; Inside the Willenhall built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area77 m² (829 sq ft)
Energy ratingC (70 out of 100)
PropertySemi-detached house, 5 habitable rooms
Built1950 to 1966
HeatingBoiler and radiators, mains gas
WallsCavity wall, filled cavity

From the energy performance certificate lodged in December 2025, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Walsall - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Walsall
Application type
Full Application
Postcode
WV12 5TH
Received
12 Aug 2026
Validated
12 Aug 2026
Ward
New Invention
Case officer
Show
Target decision
7 Oct 2026
Applicant
Show
Agent
Seven Design Build
Freehold owner
Show

Decision outlook

Day 58, past the statutory target. 80% of extensions in Walsall are decided within thirteen weeks, which runs to 11 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 7 Oct 2026.

Day 582 days past the 56-day target
49%decided within 8 weeks
79%approved
379decided in the last year

Plota live figures for extensions decided by Walsall in the last twelve months, from validation. Walsall decision record →

Consultation & key dates

Consultation
17 Sept 2026
Comments by
1 Oct 2026
Walsall
Planning Authority Score
2.1/10
Poor
#271 of 296 councils
Relevant to this application:
Householder decisions

Walsall is slower than most councils at deciding householder applications, ranking #228 out of 296. The council extends the time limit on 56% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Walsall decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #230 of 296
89%
Householder approved
Below avg (90%) #213 of 296
52%
Decided in 8 weeks
Below avg (63%) #228 of 296
56%
Extended time limit
Above avg (41%) #257 of 296
66%
Minor dwellings approved
95 decided (1-9 homes)
75%
Major dwellings approved
4 decided (10+ homes)
60%
Change of use approved
48 decided
800
Total decisions
128 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Freehold owner: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.