76-77 South Parade Chiswick W4 5LF Data via plota.co.uk

264112FUL - Full Application Pending Consideration

Proposal

Alterations to shopfront; installation of signage to existing ground floor commercial unit Data via plota.co.uk

View original council record ↗Last checked

Ealing Council is publishing its applications late: so far it has put about three fifths of those it has numbered since early September on its register. Plota adds each one as soon as the council publishes it.

Application progress

✓
Received
12 Nov 2026
✓
Consultation
20 Nov 2026
Decision
Expected by 7 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision around 7 Jan 2027, from Ealing's recent signs and adverts.

Comments are open until 23 Dec 2026

Comment on this application ↗

Site constraints 11

Grade II listed: The Duke of Sussex Public House
List entry 1268490 · 12 m away · 1 more listed building within 150 m (1 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other one with distances
Historic England ↗
Acton Green conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Archaeological priority area: Possible medieval hamlet around the Green
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 572 m away: Thames Tideway Tunnel
The site is 572 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Local nature reserve 373 m away: Gunnersbury Triangle; Inside the Ealing built-up area; Public transport access: PTAL 4 (good), TfL 2023, for the 100 m square; Designated open space 27 m away; Open access land 26 m away: Access Land - Combined Open Country, Registered Common Land and Section 16 Dedicated Land.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 21 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area160 m² (1,722 sq ft)
Energy ratingB (asset rating 39)
UseRestaurants and Cafes/Drinking Establishments/Takeaways
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in November 2024, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ealing
Application type
Full Application
Postcode
W4 5LF
Received
12 Nov 2026
Validated
12 Nov 2026
Ward
Southfield
Target decision
7 Jan 2027
Applicant
Show
Agent
AH ARCHITECTURE
Leaseholder
Show

Decision outlook

Day 11 of the 56-day target. Ealing usually decides signs and adverts by day 56.

Day 1145 days to the 56-day target
53%decided within 8 weeks
87%approved
56decided in the last year

Plota live figures for signs and adverts decided by Ealing in the last twelve months, from validation. Ealing decision record →

Public comments

No public comments yet.

Last counted 21 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15365960
Planning Portal ref
PP-15365960
Consultation
20 Nov 2026
Comments by
23 Dec 2026
Site or press notice
2 Dec 2026
Statutory expiry
7 Jan 2027
Env. assessment
No
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 overall
Relevant to this application:
Householder decisions

Ealing is slower than most councils at deciding householder applications: #264 of 296 on speed. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.