Land Adj The Grove Booton Norfolk Data via plota.co.uk

2026/0754 - Full Approved

Proposal

Installation of post construction field drainage to support the operation of the Hornsea Project Three onshore export cable route (EIA Development). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
19 Mar 2026
✓
Validated
29 Apr 2026
✓
Consultation
6 May 2026
✓
Approved
31 Jul 2026

Approved on 31 Jul 2026 · Last checked 30 Sept 2026

Documents 181

Plans & drawings 68

PDF Dll annex 3 site plan Drawing (K) · 24 Jun 2026 View ↗ PDF Dll annex 3 site plan Drawing (K) · 24 Jun 2026 View ↗ PDF Dll annex 3 site plan Drawing (K) · 24 Jun 2026 View ↗ PDF Dll annex 3 site plan Drawing (K) · 24 Jun 2026 View ↗ PDF Appendix 1 - site specific plan and design drawing Report (K) · 29 Apr 2026 View ↗ PDF How03-wm-tcpa-24.01 lp Location plan Drawing (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and found water plan (cable ) part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 18 - construction traffic mangement plan - part 1 Report (K) · 19 Mar 2026 View ↗ PDF Req 18 - construction traffic mangement plan - part 11 Report (K) · 19 Mar 2026 View ↗ PDF Req 18 - construction traffic mangement plan - part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 18 - construction traffic mangement plan - part 2 Report (K) · 19 Mar 2026 View ↗ PDF Req 18 - construction traffic mangement plan - part 3 Report (K) · 19 Mar 2026 View ↗ PDF Req 18 - construction traffic mangement plan - part 4 Report (K) · 19 Mar 2026 View ↗ PDF Req 18 - construction traffic mangement plan - part 5 Report (K) · 19 Mar 2026 View ↗ PDF Req 18 - construction traffic mangement plan - part 6 Report (K) · 19 Mar 2026 View ↗ PDF Req 18 - construction traffic mangement plan - part 7 Report (K) · 19 Mar 2026 View ↗ PDF Req 18 - construction traffic mangement plan - part 9 Report (K) · 19 Mar 2026 View ↗ PDF Req 18 - construction traffic mangement plan - part 8 Report (K) · 19 Mar 2026 View ↗ PDF Req 8 - landscape management plan - part 1 Report (K) · 19 Mar 2026 View ↗ PDF Req 8 - landscape management plan - part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 8 - landscape management plan - part 12 Report (K) · 19 Mar 2026 View ↗ PDF Req 8 - landscape management plan - part 11 Report (K) · 19 Mar 2026 View ↗ PDF Req 8 - landscape management plan - part 14 Report (K) · 19 Mar 2026 View ↗ PDF Req 8 - landscape management plan - part 13 Report (K) · 19 Mar 2026 View ↗ PDF Req 8 - landscape management plan - part 2 Report (K) · 19 Mar 2026 View ↗ PDF Req 8 - landscape management plan - part 4 Report (K) · 19 Mar 2026 View ↗ PDF Req 8 - landscape management plan - part 3 Report (K) · 19 Mar 2026 View ↗ PDF Req 8 - landscape management plan - part 5 Report (K) · 19 Mar 2026 View ↗ PDF Req 8 - landscape management plan - part 6 Report (K) · 19 Mar 2026 View ↗ PDF Req 8 - landscape management plan - part 7 Report (K) · 19 Mar 2026 View ↗ PDF Req 8 - landscape management plan - part 8 Report (K) · 19 Mar 2026 View ↗ PDF Req 8 - landscape management plan - part 9 Report (K) · 19 Mar 2026 View ↗ PDF Pink footed goose management plan Report (K) · 19 Mar 2026 View ↗ PDF Req 13 and 15 - surface water and foul water plan (cable) - part 10 Report (K) · 19 Mar 2026 View ↗

Other documents 84

PDF Update cover letter Report (K) · 23 Jun 2026 View ↗ PDF Returned mail - normans charity farm Correspondence (D) · 21 May 2026 View ↗ PDF Returned mail - grove bungalow Correspondence (D) · 21 May 2026 View ↗ PDF Cover letter including environmental appraisal Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 1 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 10 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 11 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 12 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 13 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 14 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 15 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 16 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 17 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 18 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 19 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 20 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 2 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 21 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 22 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 23 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 24 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 25 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 26 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 28 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 29 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 3 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 30 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 31 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 33 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 34 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 35 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 36 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 37 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 38 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 39 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 4 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 40 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 42 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 41 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 43 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 46 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 44 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 45 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 49 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 47 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 50 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 51 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 52 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 53 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 55 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 56 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 54 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 57 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 58 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 59 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 63 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 64 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 65 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 62 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 61 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 66 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 67 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 68 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 7 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 69 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 70 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 72 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 71 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 73 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 74 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 75 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 76 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 77 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 8 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 78 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 79 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 81 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 80 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 9 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 32 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 48 Report (K) · 19 Mar 2026 View ↗ PDF Req 14 - contaminated water cable corridor - part 60 Report (K) · 19 Mar 2026 View ↗ PDF Req 16 - written scheme of investigation Report (K) · 19 Mar 2026 View ↗ PDF Req 17 - code of construction practice Report (K) · 19 Mar 2026 View ↗

All documents on the council site ↗

Associated applications 2

Site constraints 4

Nutrient neutrality catchment: River Wensum SAC
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 2. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project about 297 m away: Hornsea Project Three Offshore Wind Farm
The site is about 297 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Sheringham and Dudgeon Extension Projects (decided, about 903 m); Norfolk Boreas (decided, about 1.9 km); Norfolk Vanguard (decided, about 1.9 km).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
2 listed buildings within 150 m of the postcode pin
Nearest: Barn at the Grove, Grade II, about 47 m from the postcode pin · 2 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 2 with distances
Historic England ↗
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Norfolk Broadland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full
Received
19 Mar 2026
Validated
29 Apr 2026
Ward
Great Witchingham
Parish
Booton
Case officer
Show
Target decision
19 Aug 2026
Decision
Approval with Conditions
Decision date
31 Jul 2026
Applicant
Show

How this decision compares

Decided in 93 days from validation, 38 days slower than South Norfolk Broadland's median of 55 for utility and infrastructure works. Approved, as 98% of utility and infrastructure works here are.

56%decided within 8 weeks
98%approved
113decided in the last year

Plota live figures for utility and infrastructure works decided by South Norfolk Broadland in the last twelve months, from validation. South Norfolk Broadland decision record →

Public comments

No public comments yet.

26 neighbours consulted · Last counted 30 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14788563
Planning Portal ref
PP-14788563
Neighbours
6 May 2026
Consultation
6 May 2026
Comments by
6 Jun 2026
Site or press notice
13 May 2026
Statutory expiry
19 Aug 2026
Env. assessment
Yes
South Norfolk Broadland
Planning Authority Score
5.9/10
Average
#106 of 296 overall
Relevant to this application:
Householder decisions

South Norfolk Broadland is #136 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
South Norfolk Broadland decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #50 of 296
95%
Householder approved
Above avg (90%) #71 of 296
67%
Decided in 8 weeks
Above avg (63%) #136 of 296
42%
Extended time limit
Above avg (41%) #161 of 296
82%
Minor dwellings approved
137 decided (1-9 homes)
92%
Major dwellings approved
12 decided (10+ homes)
100%
Change of use approved
33 decided
1,013
Total decisions
67 refused in the year to March 2026