The Boathouse St Winnow Lostwithiel Cornwall PL22 0LF Data via plota.co.uk

PA26/05630 - Full application Awaiting decision

Proposal

Proposed domestic extension and associated works Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 2 Sept 2026
✓
Consultation
10 Sept 2026
Decision
Expected by 28 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 26 Oct 2026, from Cornwall's recent extensions.

Comments are open until 8 Oct 2026

Comment on this application ↗

Site constraints 9

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Public footpath 19 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
National landscape 14 m away: Cornwall
Outside the landscape; its setting can still be raised.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
7 listed buildings within 150 m
Nearest: Quay 70 Metres West of Church of St Winnow, Grade II, 44 m away · 1 Grade I, 6 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 7 with distances
Historic England ↗
Also on the record
Flood defence 13 m away (natural high ground, designed for a 1 in 2 year flood); Priority habitat 11 m away: Mudflats.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Cornwall - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Cornwall
Application type
Full application
Postcode
PL22 0LF
Received
around 2 Sept 2026
Validated
2 Sept 2026
Ward
Lostwithiel And Lanreath
Parish
St. Winnow
Case officer
Show
Target decision
28 Oct 2026
Applicant
Show
Agent
ALA Architects Ltd

Decision outlook

Day 37 of the 56-day target. Cornwall usually decides extensions by day 54.

Day 3719 days to the 56-day target
84%decided within 8 weeks
95%approved
100%go to committee

Plota live figures for extensions decided by Cornwall in the last twelve months, from validation. Cornwall decision record →

Public comments

No public comments yet.

1 neighbour consulted · Last counted 1 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15153271
Planning Portal ref
PP-15153271
Neighbours
10 Sept 2026
Consultation
10 Sept 2026
Comments by
8 Oct 2026
Site or press notice
17 Sept 2026
Statutory expiry
28 Oct 2026
Env. assessment
No
Cornwall
Planning Authority Score
7.9/10
Good
#28 of 296 councils
Relevant to this application:
Householder decisions

Cornwall is faster than most councils at deciding householder applications, ranking #64 out of 296. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Cornwall decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #79 of 296
97%
Householder approved
Above avg (90%) #28 of 296
76%
Decided in 8 weeks
Above avg (63%) #64 of 296
35%
Extended time limit
Below avg (41%) #101 of 296
82%
Minor dwellings approved
1180 decided (1-9 homes)
94%
Major dwellings approved
67 decided (10+ homes)
93%
Change of use approved
194 decided
4,839
Total decisions
363 refused in the year to March 2026