The Stag Recreation Ground Nottingham Road Kimberley Nottinghamshire Data via plota.co.uk

25/00583/DOC - Discharge of Conditions Application Decided

Proposal

Conditions 4 (materials), 6 (Construction / demolition Method Statement) and 9 (BNG) of planning reference Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Aug 2025
✓
Validated
5 Aug 2025
✓
Discharge of Conditions
3 Sept 2025
✓
Consultation
23 Sept 2025

Discharge of Conditions on 3 Sept 2025 · Director of Planning and Development · Last checked 13 Oct 2026

Associated applications 2

  • Part of

    FullApprovedcouncil archive

    Conditions 4, 6, 9 decided (outcome not recorded)

    • ConditionsConditions 4 (materials), 6 (Construction / demolition Method Statement) and 9 (BNG)This application25/00583/DOC

Site constraints 4

Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Coalfield, development low risk area; Inside the Kimberley built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Broxtowe - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Broxtowe
Application type
Discharge of Conditions Application
Received
4 Aug 2025
Validated
5 Aug 2025
Ward
Kimberley
Parish
Kimberley Town Council
Target decision
7 Oct 2025
Decision
Discharge of Conditions
Decision date
3 Sept 2025
Decision level
Director of Planning and Development
Applicant
Show
Agent
Paul Gaughan Building Consultants Limited

Public comments

No public comments yet.

Last counted 13 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14035090
Planning Portal ref
PP-14035090
Consultation
23 Sept 2025
Comments by
14 Oct 2025
Statutory expiry
30 Sept 2025
Env. assessment
No
Broxtowe
Planning Authority Score
8.4/10
Excellent
#16 of 296 councils
Relevant to this application:
Householder decisions

Broxtowe is faster than most councils at deciding householder applications, ranking #48 out of 296. Only 29% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Broxtowe decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #35 of 296
96%
Householder approved
Above avg (90%) #52 of 296
78%
Decided in 8 weeks
Above avg (63%) #48 of 296
29%
Extended time limit
Below avg (41%) #48 of 296
83%
Minor dwellings approved
42 decided (1-9 homes)
100%
Major dwellings approved
7 decided (10+ homes)
92%
Change of use approved
36 decided
479
Total decisions
29 refused in the year to March 2026