First Floor Savannah House 3 Ocean Way Southampton SO14 3TJ Data via plota.co.uk

26/00948/ADV - Advert Application Awaiting decision

Proposal

Installation of replacement externally illuminated fascia sign. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 Aug 2026
Decision
Expected by 9 Oct 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 56.

Site constraints 8

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Calshot to Gosport across the site
Matters where it crosses or adjoins the site; the route and its margin are protected.
Article 4 direction
HMO. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Special protection area 65 m away: Solent and Dorset Coast
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
4 listed buildings within 150 m; Inside the Southampton built-up area; National infrastructure project 1265 m away: Solent Gateway 2, at pre-application.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southampton - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Advert Application
Postcode
SO14 3TJ
Received
14 Aug 2026
Validated
14 Aug 2026
Ward
Bargate
Case officer
Show
Target decision
9 Oct 2026
Applicant
Show
Agent
BDP
Leaseholder
Show

Decision outlook

Day 56, past Southampton's usual 54 days for signs and adverts. 89% are decided within thirteen weeks, so most likely by 13 Nov 2026.

Day 560 days to the 56-day target
76%decided within 8 weeks
95%approved
43decided in the last year

Plota live figures for signs and adverts decided by Southampton in the last twelve months, from validation. Southampton decision record →

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
A5575
Statutory expiry
9 Oct 2026
Env. assessment
No
Southampton
Planning Authority Score
5/10
Average
#150 of 296 councils
Relevant to this application:
Other decisions

Southampton ranks #158 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Southampton decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #117 of 296
93%
Householder approved
Above avg (90%) #137 of 296
63%
Decided in 8 weeks
Above avg (63%) #158 of 296
40%
Extended time limit
Below avg (41%) #154 of 296
70%
Minor dwellings approved
50 decided (1-9 homes)
100%
Major dwellings approved
8 decided (10+ homes)
86%
Change of use approved
109 decided
742
Total decisions
72 refused in the year to March 2026

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.