Land Off Sunningdale Waltham North East Lincolnshire Data via plota.co.uk

DM/0459/25/CND - Discharge Condition Awaiting decision

Proposal

Details in Discharge of Condition 12 (Acoustic Fencing) pursuant to Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 3 Jun 2025
✓
Consultation
6 Jun 2025
Decision
Target date was 22 May 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 18 Nov 2026; it is now day 533.

The consultation period closed on 30 Jun 2025.

Site constraints 3

National infrastructure project 466 m away: Hornsea Offshore Wind Farm (Zone 4) - Project Two
The site is 466 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Hornsea Offshore Wind Farm (Zone 4) - Project One (decided, 466 m); Viking CCS Pipeline (decided, 1995 m); Grimsby to Walpole (at pre-application, 607 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Waltham built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 16 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North East Lincs - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Discharge Condition
Received
around 3 Jun 2025
Validated
3 Jun 2025
Ward
Waltham Ashby Brigsley
Parish
Waltham Parish Council
Case officer
Show
Target decision
22 May 2026
Applicant
Show
Agent
Watson Batty Architects Ltd (MB)

Decision outlook

Day 533, past the statutory target. 98% of discharge of conditions in North East Lincs are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 16 Nov 2026.

Day 533477 days past the 56-day target
93%decided within 8 weeks
100%approved
92decided in the last year

Plota live figures for discharge of conditions decided by North East Lincs in the last twelve months, from validation. North East Lincs decision record →

Public comments

No public comments yet.

Last counted 16 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14043152
Planning Portal ref
PP-14043152
Consultation
6 Jun 2025
Comments by
30 Jun 2025
Statutory expiry
29 Jul 2025
Env. assessment
No
North East Lincs
Planning Authority Score
5.3/10
Average
#132 of 296 councils
Relevant to this application:
Householder decisions

North East Lincs ranks #151 out of 296 councils for householder decision speed. 52% of applications have the time limit extended, above the 41% national average. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
North East Lincs decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #22 of 296
97%
Householder approved
Above avg (90%) #35 of 296
64%
Decided in 8 weeks
Above avg (63%) #151 of 296
52%
Extended time limit
Above avg (41%) #235 of 296
95%
Minor dwellings approved
43 decided (1-9 homes)
87%
Major dwellings approved
15 decided (10+ homes)
82%
Change of use approved
22 decided
467
Total decisions
24 refused in the year to March 2026