1 - 30 Nutfield Close London N18 2SP Data via plota.co.uk

26/04205/FUL - Full Application in Progress

Proposal

Replacement of external weatherboard cladding to front and rear elevations. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Oct 2026
✓
Consultation
7 Oct 2026
Decision
Expected by 26 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 10 Nov 2026 and 20 Nov 2026, from Enfield's recent extensions.

Comments are open until 28 Oct 2026

Comment on this application ↗

Site constraints 11

Article 4 direction
Borough wide. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From rivers. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Archaeological priority area: Archaeological priority area surrounding possible early settlement
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Enfield AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 829 m away: North London (Electricity Line) Reinforcement
The site is 829 m from the project boundary. Electricity line, decided. The project page says whether consent was granted. Also within 2 km: North London Heat and Power Project (decided, 1669 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Enfield built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square; Heritage at risk 87 m away: North Tottenham High Road; Designated open space 10 m away; Town centre 32 m away: Angel Edmonton.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 7 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area62 m² (667 sq ft)
Energy ratingC (73 out of 100)
PropertyEnd-terrace flat, 3 habitable rooms
Built1976 to 1982
HeatingBoiler and radiators, mains gas
WallsCavity wall, filled cavity

From the energy performance certificate lodged in December 2019, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Enfield - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Enfield
Application type
Full
Postcode
N18 2SP
Received
1 Oct 2026
Validated
1 Oct 2026
Ward
Upper Edmonton
Case officer
Show
Target decision
26 Nov 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Capital PCC

Decision outlook

Day 8 of the 56-day target. Enfield usually decides extensions by day 44.

Day 848 days to the 56-day target
90%decided within 8 weeks
82%approved
1,728decided in the last year

Plota live figures for extensions decided by Enfield in the last twelve months, from validation. Enfield decision record →

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15204381
Planning Portal ref
PP-15204381
Consultation
7 Oct 2026
Comments by
28 Oct 2026
Statutory expiry
26 Nov 2026
Env. assessment
No
Enfield
Planning Authority Score
6.9/10
Good
#65 of 296 councils
Relevant to this application:
Householder decisions

Enfield is one of the fastest councils in England for householder decisions, ranking #15 out of 296. Only 5% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Enfield is also one of the strictest councils - it refuses more householder applications than almost any other, with only 83% approved vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Enfield decision statistics
Based on MHCLG data, the year to March 2026
78%
Overall approval rate
Below avg (87%) #271 of 296
83%
Householder approved
Below avg (90%) #260 of 296
90%
Decided in 8 weeks
Above avg (63%) #15 of 296
5%
Extended time limit
Below avg (41%) #1 of 296
60%
Minor dwellings approved
265 decided (1-9 homes)
63%
Major dwellings approved
8 decided (10+ homes)
72%
Change of use approved
322 decided
1,939
Total decisions
433 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.