Flood protection windows and wall strengthening at Bridge Mill, Hebden Bridge
Summary of planning committee decision
Decided by Calderdale Planning Committee on 17 Feb 2026.
The proposed works
The application proposed flood protection windows, blocking up one window and strengthening works including partial masonry wall rebuilding.
“25/01117/LBC - BRIDGE MILL, ST GEORGES SQUARE, HEBDEN BRIDGE, CALDERDALE, HX7 8ET - REPLACEMENT OF NINE WINDOWS WITH FLOOD PROTECTION WINDOWS, BLOCKING UP OF TWO WINDOWS AND STRENGTHENING WORKS, INCLUDING PARTIAL REBUILDING OF MASONRY WALLS. (LISTED BUILDING CONSENT).”
“The Planning Officer reported orally that only one window would be blocked up and the description of the application was changed to reflect this.”
Minutes
The listed mill
Bridge Mill is a Grade II listed former textile mill beside Hebden Water, with St George’s Bridge immediately west.
“The Grade II listed Bridge Mill, known locally as Innovation Mill, is located on St George’s Square in Hebden Bridge. The site is relatively flat, located in the valley bottom on the left bank of Hebden Water. The Grade II listed St George’s Bridge is located immediately west of the Mill.”
“The main mill represents the earliest phase of the building. The engine house is shorter in length than the main mill and is built in an irregular plan which is stepped to follow the curve of Bridge Gate. The engine house is thought to have been constructed c.1860 at the same time as the chimney, when steam power was added to the mill. The chimney is also constructed of hammer dressed sandstone and is located immediately west of the north-west elevation.”
Officer report
Flood scheme background
The works formed part of wider proposals to improve flood defences after repeated flooding affected properties and transport routes.
“Hebden Bridge has experienced numerous flooding events historically. Recent severe flood events occurred in both 2012 and 2013 when more than 1200 properties and the transport routes in the town were affected because of an extreme flood event; and in 2015 more than 3400 properties experienced structural issues after an extreme flood. Furthermore, 500 homes and approximately 400 businesses were affected in 2020.”
“At present, Hebden Bridge has no formal flood defences. An Application for full planning permission for the Hebden Bridge Flood Alleviation Scheme (Planning Application Ref 25/00947/FUL) including the repair and reconstruction of the river walls on Hebden Water and the River Calder, construction of new walls within St Pols Car Park, construction of vertical rising flood barriers on Bridge Gate and Old Gate, the repair and reinforcement of specific properties, modification to…”
Officer report
Officers’ recommendation
Officers recommended consent because the low level of heritage harm would be outweighed by extensive public benefits from flood protection and heritage protection.
“Partial rebuilding of the engine house would result in the demolition of historic fabric, and the loss of a large pattress plate, which would result in some loss of evidence of the original construction and development of the listed building, and therefore constitutes less than substantial harm to its significance.”
“As such, the low level of less than substantial harm is considered to be outweighed by the extensive public benefits of the works both in terms of the substantial weight given to the environment, economic and social benefits of the wider flood scheme, of which the proposal forms an integral part; and in terms of the resulting heritage protection awarded by the flood scheme.”
Officer report
Heritage impact
Replacement windows and internal strengthening were assessed as causing no harm, while partial rebuilding would cause low-level less than substantial harm.
“Overall, the proposals are considered to result in a low level of less than substantial harm by virtue of the demolition and rebuilding of part of the riverside elevation of the engine house, which would diminish the historic interest of this area of the building.”
Officer report
Consultation responses
Historic England made no comments, conservation officers and the town council raised no objections, and archaeology advisers sought recording conditions.
“136 Under Paragraph 034 of the National Planning Policy Guidance (NPPG) on Consultation and Pre-Decision Matters, dated 23/07/2019 (Reference ID: 15-026-20190722), the Council has, at its discretion, accepted public comments made after the close of the consultation period for due consideration throughout the determination process.”
“Historic England – No comments. We suggest that you seek the views of your specialist conservation and archaeological advisers.”
Officer report
Public representations
No representations were made during the consultation period or received by the time of publication.
“During the public consultation no representations were made.”
Officer report
Who spoke
The applicant attended the meeting and answered questions from the committee.
Committee decision
The committee resolved to grant listed building consent in accordance with the recommendation.
“The Planning Officer presented a written report of the Director, Regeneration and Strategy which had been submitted in accordance with the Planning (Listed Buildings and Conservation Areas) Act 1990 and the Planning (Listed Buildings and Conservation Areas) Regulations 1990 and reported orally that it was recommended to Grant Listed Building Consent by the Director, Regeneration and Strategy, for the reasons set out in the report.”
“RESOLVED that the application for listed building consent be granted in accordance with the recommendation of the Director, Regeneration and Strategy.”
Minutes
Councillors at the meeting
- Colin HutchinsonLabourFor(no vote against recorded)
- Silvia DacreLabourFor(no vote against recorded)
- Sue HoldsworthLib DemFor(no vote against recorded)
- Mohammed Shazad FazalSubstitute for TimbersLabourFor(no vote against recorded)
- Paul HawkalukSubstitute for HuntReform UKFor(no vote against recorded)
- Ann KingstoneSubstitute for KimberLabourFor(no vote against recorded)
The minutes record this decision with no vote against, so each member present for this item is shown as voting for it.
Apologies Howard Blagbrough Conservative, Peter Hunt Reform UK, Katie Kimber Labour, Jonathan Timbers Labour
Source: Plota analysis of the council's minutes; parties from the council's list of councillors.
Sources
- Calderdale Planning Committee minutes, 17 February 2026
- Agenda and papers (council website)
Source: Plota analysis of Calderdale's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.
Committee decisions and nationwide planning applications, in one API
The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.
See the API →At the meeting
- Committee
- Calderdale Planning Committee
- Council
- Calderdale
- Date
- Tuesday 17 February 2026
- Recommendation
- Officers recommended approval
- Committee decided
- Approved
- Councillors
- 6Labour 4Lib Dem 1Reform UK 1Show votes
- Minutes
- The council's minutes
- Meeting
- Agenda and papers (council website)
- Application
- View application →
- All decisions
- Calderdale committee decisions →
This committee's year
15 decisions in the 12 months to this meeting, 1 against officer advice.
Source: Plota analysis of the committee's minutes.