Ryde Pier Esplanade Ryde Isle Of Wight Data via plota.co.uk

26/01285/LBC - Listed Building Consent Registered

Proposal

Listed Building Consent for refurbishment of walkway within the non-operational area between zones 1 and 3 involving the replacement of timber walkways with grey coloured Glass Reinforced Plastic (GRP) mesh/grating Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
16 Sept 2026
Decision
Expected by 11 Nov 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision around 11 Nov 2026, from Isle of Wight's recent listed building works. Comments are open until 23 Oct 2026.

Comment on this application ↗

Site constraints 6

Special protection area: Solent & Southampton Water
2 designations overlap here. A habitats assessment is needed.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
SSSI: Ryde Sands and Wootton Creek SSSI
Natural England must be consulted on work that may affect it.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Heritage at risk: Ryde
On the register of historic places assessed as at risk.
A designated building, monument, park or conservation area assessed as at risk from neglect, decay or development. Proposals that secure its future are looked on favourably.
Historic England ↗
Habitat network: Sssi
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
24 listed buildings within 150 m.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 23 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Isle of Wight - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent
Postcode
PO33 2HE
Received
16 Sept 2026
Validated
16 Sept 2026
Ward
Ryde North West
Parish
Ryde
Case officer
Show
Agent
Network Rail Infrastructure Limited

Decision outlook

Day 19 of the 56-day target. Isle of Wight usually decides listed building works by day 56.

Day 1937 days to the 56-day target
92%decided within 8 weeks
97%approved
38decided in the last year

Plota live figures for listed building works decided by Isle of Wight in the last twelve months, from validation. Isle of Wight decision record →

Public comments

No public comments yet.

Last counted 1 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15218039
Comments by
23 Oct 2026
Env. assessment
No
Isle of Wight
Planning Authority Score
8.9/10
Excellent
#7 of 296 councils
Relevant to this application:
Other decisions

Isle of Wight is one of the fastest councils in England for householder decisions, ranking #11 out of 296. Only 15% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Isle of Wight decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #84 of 296
95%
Householder approved
Above avg (90%) #81 of 296
92%
Decided in 8 weeks
Above avg (63%) #11 of 296
15%
Extended time limit
Below avg (41%) #11 of 296
84%
Minor dwellings approved
144 decided (1-9 homes)
67%
Major dwellings approved
18 decided (10+ homes)
94%
Change of use approved
34 decided
792
Total decisions
63 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use