Mansters, Manchester Road, Sway, Lymington SO41 6AS Data via plota.co.uk

26/01121FULL - Full Application Pending Decision

Proposal

1no. dwelling; garage (demolition of existing house and garage) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 Oct 2026
✓
Consultation
20 Oct 2026
✓
Validated
4 Nov 2026
Decision
Expected by 15 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 28 Dec 2026, from New Forest (Park)'s recent demolitions.

Comments are open until 26 Nov 2026

Comment on this application ↗

Site constraints 13

Aerodrome safeguarding zoneNfnpa/0008/08
Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
New Forest National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
2 Article 4 directions
Article 4 Direction Np New Forest Campsite · Article 4 Direction Np New Forest Recreational Campsite. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Special area of conservation 135 m away: The New Forest
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI 134 m away: The New Forest SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
National infrastructure project 863 m away: Navitus Bay Wind Park
The site is 863 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Aerodrome safeguarding zoneCouncil record
Recorded by the council for this site.
Council site ↗
Nfnpa/0008/08Council record
Recorded by the council for this site.
Council site ↗
Also on the record
Inside the Sway built-up area; Priority habitat 29 m away: Deciduous woodland; Tree preservation order 29 m away: Land at High Forest and Forest Corner, Manchester Road, Sway; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 5, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 21 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area197 m² (2,120 sq ft)
Energy ratingE (51 out of 100), could reach C
PropertyDetached house, 8 habitable rooms
Built1900 to 1929
HeatingBoiler and radiators, mains gas
WallsCavity wall, as built, no insulation (assumed)

From the energy performance certificate lodged in June 2024, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in New Forest (Park) - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
SO41 6AS
Received
8 Oct 2026
Validated
4 Nov 2026
Parish
Sway Parish Council
Case officer
Show
Target decision
15 Dec 2026
Applicant
Show
Agent
Morgan Building design

Decision outlook

Day 19 of the 56-day target. New Forest (Park) usually decides demolitions by day 54.

Day 1937 days to the 56-day target
70%decided within 8 weeks
94%approved
100%go to committee

Plota live figures for demolitions decided by New Forest (Park) in the last twelve months, from validation. New Forest (Park) decision record →

Consultation & key dates

Alt. reference
PP-15254730
Comments by
26 Nov 2026
Site or press notice
20 Oct 2026
New Forest (Park)
Planning Authority Score
3.3/10
Poor
#226 of 296 overall
Relevant to this application:
Householder decisions

New Forest (Park) is slower than most councils at deciding householder applications: #254 of 296 on speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
New Forest (Park) decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #136 of 296
92%
Householder approved
Above avg (90%) #160 of 296
45%
Decided in 8 weeks
Below avg (63%) #254 of 296
44%
Extended time limit
Above avg (41%) #180 of 296
75%
Minor dwellings approved
28 decided (1-9 homes)
50%
Major dwellings approved
4 decided (10+ homes)
83%
Change of use approved
18 decided
487
Total decisions
55 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.