St Olaf House 13 Tooley Street London Southwark SE1 2PR Data via plota.co.uk

25/AP/2377 - Minor application Approved

Proposal

Installation of plant at rooftop level, including replacement and additional equipment Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Aug 2025
✓
Validated
10 Sept 2025
✓
Approved
29 Oct 2025

Approved on 29 Oct 2025 · Delegated Panel - Simple · Last checked 12 Oct 2026

Documents 18

All documents on the council site ↗

Site constraints 17

Grade II* listed: St Olaf House
List entry 1385977 · The pin is inside its outline · 10 more listed buildings within 150 m (10 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 10 with distances
Historic England ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Tooley Street conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
2 Article 4 directions
Central Activities Zone · London Bridge District Town Centre. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 386 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Southwark AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: London Bridge
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Thames Path 17 m away
Matters where it crosses or adjoins the site; the route and its margin are protected.
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Scheduled monument 180 m away: Romano-British bath house and medieval remains at 11-15 Borough High Street; Wider setting of protected view 2A.1 Parliament Hill summit to St Paul's Cathedral; Flood defence 23 m away (wall, designed for a 1 in 1000 year flood); Inside the Southwark built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Designated open space 24 m away.
Not affected
Not green belt

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southwark - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Southwark
Application type
Minor application
Postcode
SE1 2PR
Received
20 Aug 2025
Validated
10 Sept 2025
Ward
London Bridge & West Bermondsey
Parish
Bermondsey And Rotherhithe
Case officer
Show
Target decision
4 Nov 2025
Decision
Minor - GRANTED
Decision date
29 Oct 2025
Decision level
Delegated Panel - Simple
Agent
Rolfe Judd Planning

How this decision compares

Decided in 49 days from validation, 6 days faster than Southwark's median of 55 for full applications. Approved, as 87% of full applications here are.

55%decided within 8 weeks
87%approved
539decided in the last year

Plota live figures for full applications decided by Southwark in the last twelve months, from validation. Southwark decision record →

Public comments

No public comments yet.

Last counted 12 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
4 Nov 2025
Env. assessment
No
Southwark
Planning Authority Score
7/10
Good
#64 of 296 councils
Relevant to this application:
Householder decisions

Southwark is faster than most councils at deciding householder applications, ranking #54 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Southwark decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #93 of 296
95%
Householder approved
Above avg (90%) #92 of 296
78%
Decided in 8 weeks
Above avg (63%) #54 of 296
37%
Extended time limit
Below avg (41%) #122 of 296
92%
Minor dwellings approved
259 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
82%
Change of use approved
38 decided
1,622
Total decisions
132 refused in the year to March 2026