Approximately 90m south-west of 20 Old Road, Camlough, Newry, BT35 7JW Data via plota.co.uk

LA07/2026/1130/F - Full Valid

Proposal

Erection of dwelling and garage with new access arrangements (change of house type and garage approved under ) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
19 Sept 2026
✓
Validated
6 Oct 2026
Decision
Expected by 1 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 4 May 2027 and 22 Jun 2027, from Newry Mourne Down's recent full applications.

The consultation period closed on 11 Nov 2026.

Site constraints 1

Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Newry Mourne Down - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full
Postcode
BT35 7JW
Received
19 Sept 2026
Validated
6 Oct 2026
Ward
Camlough
Applicant
Show
Agent
Ballintemple Design

Decision outlook

Day 48 of the 56-day target. Newry Mourne Down usually decides full applications by day 235.

Day 48187 days to the predicted decision (day 235)
2%decided within 8 weeks
97%approved
487decided in the last year

Plota live figures for full applications decided by Newry Mourne Down in the last twelve months, from validation. Newry Mourne Down decision record →

Consultation & key dates

Planning Portal ref
PP-15236269
Comments by
11 Nov 2026
Site or press notice
28 Oct 2026