Workshop Adjacent Rams Rest School Lane Martlesham Woodbridge Suffolk IP12 4RS Data via plota.co.uk

DC/26/3965/DRC - Approval of Details Reserved by Cond. Awaiting decision

Proposal

Discharge of Conditions Nos. 4, 5 and 6 of DC/26/1764/FUL - Demolition and Replacement of three Workshops with Singular Workshop - 4. Working Hours - 5 Lighting design strategy for biodiversity - 6 Construction and demolition strategy Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
10 Nov 2026
Decision
Expected by 5 Jan 2027

Under consideration

No decision has been issued yet. A decision is expected by 5 Jan 2027.

Associated applications 2

Site constraints 10

Suffolk Coast & Heaths National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
National infrastructure project 645 m away: East Anglia THREE Offshore Wind Farm
The site is 645 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Other Priority Habitats - NEZ
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Special protection area 331 m away: Deben Estuary; Radon affected area, class 2; SSSI 331 m away: Deben Estuary SSSI; Priority habitat 7 m away: Deciduous woodland; Inside the Martlesham built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 18 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Suffolk - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Approval of Details Reserved by Cond.
Postcode
IP12 4RS
Received
10 Nov 2026
Validated
10 Nov 2026
Ward
Martlesham And Purdis Farm
Parish
Martlesham
Case officer
Show
Target decision
5 Jan 2027
Applicant
Show
Agent
Vision Design & Planning Consultants

Public comments

No public comments yet.

Last counted 18 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
5 Jan 2027
Env. assessment
No
East Suffolk
Planning Authority Score
5.3/10
Average
#129 of 296 overall
Relevant to this application:
Major dwellings

East Suffolk is #183 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Suffolk decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #81 of 296
95%
Householder approved
Above avg (90%) #76 of 296
60%
Decided in 8 weeks
Below avg (63%) #183 of 296
42%
Extended time limit
Above avg (41%) #162 of 296
80%
Minor dwellings approved
212 decided (1-9 homes)
100%
Major dwellings approved
19 decided (10+ homes)
81%
Change of use approved
139 decided
1,965
Total decisions
158 refused in the year to March 2026