7 School Road Bracon Ash Norfolk NR14 8HG Data via plota.co.uk

2026/2897 - Householder Pending Consideration

Proposal

Proposed front porch, single storey side & rear extension with outbuilding within rear garden Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Sept 2026
Decision
Expected by 24 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 22 Nov 2026, from South Norfolk Broadland's recent extensions.

Site constraints 4

Nutrient neutrality catchment: Yare Broads and Marshes
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project 846 m away: Norwich to Tilbury
The site is 846 m from the project boundary. Electricity line, examination closed, recommendation due.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 7 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £191,000 in June 2025. Semi-detached house, freehold.

12 June 2025£191,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area91 m² (980 sq ft)
Energy ratingD (58 out of 100), could reach B
PropertySemi-detached house, 6 habitable rooms
Built1950 to 1966
HeatingBoiler and radiators, oil
WallsCavity wall, filled cavity

From the energy performance certificate lodged in March 2017, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in South Norfolk Broadland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Householder
Postcode
NR14 8HG
Received
29 Sept 2026
Validated
29 Sept 2026
Ward
Mulbarton And Stoke Holy Cross
Parish
Bracon Ash And Hethel
Target decision
24 Nov 2026
Applicant
Show

Decision outlook

Day 10 of the 56-day target. South Norfolk Broadland usually decides extensions by day 54.

Day 1046 days to the 56-day target
67%decided within 8 weeks
96%approved
671decided in the last year

Plota live figures for extensions decided by South Norfolk Broadland in the last twelve months, from validation. South Norfolk Broadland decision record →

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15253561
Planning Portal ref
PP-15253561
Statutory expiry
24 Nov 2026
Env. assessment
No
South Norfolk Broadland
Planning Authority Score
5.9/10
Average
#106 of 296 councils
Relevant to this application:
Householder decisions

South Norfolk Broadland ranks #136 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
South Norfolk Broadland decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #50 of 296
95%
Householder approved
Above avg (90%) #71 of 296
67%
Decided in 8 weeks
Above avg (63%) #136 of 296
42%
Extended time limit
Above avg (41%) #161 of 296
82%
Minor dwellings approved
137 decided (1-9 homes)
92%
Major dwellings approved
12 decided (10+ homes)
100%
Change of use approved
33 decided
1,013
Total decisions
67 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.