Land Off Larch Crescent Grimsby North East Lincolnshire Data via plota.co.uk

DM/0691/26/CND - Discharge Condition Pending Consideration

Proposal

Details in Discharge of Conditions 3 (Management), 4 (Highway Details), 5 (Landscaping), 8 (Surface Water Details), 9 (Construction Method Statement), 12 (Gated Access), 13 (Landfill Gas), 14 (EV Charging), 15 (Water Efficiency) and 16 (Materials) pursuant to Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Sept 2026
✓
Consultation
16 Sept 2026
Decision
Expected by 29 Oct 2026

Under consideration

No decision has been issued yet. A decision is expected by 29 Oct 2026.

Comments are open until 10 Oct 2026

Comment on this application ↗

Documents 27

All documents on the council site ↗

Site constraints 4

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Also on the record
Local nature reserve about 416 m away: Freshney Parkway; Inside the Grimsby built-up area; National infrastructure project about 1700 m away: Stallingborough Combined Cycle Gas Turbine (CCGT) generating plant and Carbon Capture Plant (CCP), at pre-application.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North East Lincs - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Discharge Condition
Received
3 Sept 2026
Validated
3 Sept 2026
Ward
Yarborough
Case officer
Show
Target decision
29 Oct 2026
Applicant
Show
Agent
Ross Davy Associates

Public comments

No public comments yet.

Last counted 2 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15183673
Planning Portal ref
PP-15183673
Consultation
16 Sept 2026
Comments by
10 Oct 2026
Statutory expiry
29 Oct 2026
Env. assessment
No
North East Lincs
Planning Authority Score
5.3/10
Average
#132 of 296 councils
Relevant to this application:
Householder decisions

North East Lincs ranks #151 out of 296 councils for householder decision speed. 52% of applications have the time limit extended, above the 41% national average. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
North East Lincs decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #22 of 296
97%
Householder approved
Above avg (90%) #35 of 296
64%
Decided in 8 weeks
Above avg (63%) #151 of 296
52%
Extended time limit
Above avg (41%) #235 of 296
95%
Minor dwellings approved
43 decided (1-9 homes)
87%
Major dwellings approved
15 decided (10+ homes)
82%
Change of use approved
22 decided
467
Total decisions
24 refused in the year to March 2026