Lands east of existing Translink Bus Depot at Upper Edward Street, Newry and adjacent and south of No. 7… Data via plota.co.uk

Proposal

Extension to Newry Bus Depot to provide additional bus parking areas incorporating provision of 33No. electrical vehicle (‘EV’) charging units, erection of 2No. Low Voltage (‘LV’) switch room buildings, 2No.areas for future Northern Ireland Electricity (‘NIE’) Ring Main Unit (‘RMU’) Kiosks; 2No. staff shelters; along with associated site infrastructure (including: cable trays; parking bollards; bus wheel stops; Armco vehicle protection barriers; palisade fencing; 11No.12metre high lighting columns; and sound protection barrier) and all associated site works Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
23 Sept 2026
✓
Validated
28 Sept 2026
Decision
Expected by 23 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 29 Dec 2026 and 8 Feb 2027, from Newry Mourne Down's recent full applications.

Comments are open until 28 Oct 2026

Comment on this application ↗

Documents 36

Plans & drawings 20

PDF Outline Construction Environmental Management Plan (OCEMP) Other Supporting Information · 28 Sept 2026 View ↗ PDF Outline Invasive Species Management Plan Redacted Other Supporting Information · 28 Sept 2026 View ↗ PDF 05 switch #1 proposed area plan Site & Detailed Drawings · 28 Sept 2026 View ↗ PDF 12 low voltage switchroom #2 proposed area plan Site & Detailed Drawings · 28 Sept 2026 View ↗ PDF 04 Site Layout Site Layout or Block Plan · 28 Sept 2026 View ↗ PDF 03 Proposed Site Layout Site Layout or Block Plan · 28 Sept 2026 View ↗ PDF 02 Existing Site Layout Site Layout or Block Plan · 28 Sept 2026 View ↗ PDF 01 Site Location Map Site Location Plan · 28 Sept 2026 View ↗ PDF 19 EV Charging Points Site Layout Detailed Drawing Plans · 28 Sept 2026 View ↗ PDF 16 Sections D-D & F-F Engineering Workshop Cross Sections · 28 Sept 2026 View ↗ PDF 14 Sections A-A & B-B Engineering Workshop Cross Sections · 28 Sept 2026 View ↗ PDF 17 Sections F-F Engineering Workshop Cross Sections · 28 Sept 2026 View ↗ PDF 15 Sections C-C Engineering Workshop Cross Sections · 28 Sept 2026 View ↗ PDF 11 low voltage switchroom #2 proposed sections Cross Sections · 28 Sept 2026 View ↗ PDF 07 low voltage switchroom #1 proposed sections Cross Sections · 28 Sept 2026 View ↗ PDF 13 bus wash shelter plans and elevations Elevations and Floor Plans · 28 Sept 2026 View ↗ PDF 08 low voltage switchroom #1 proposed elevations Proposed Elevations · 28 Sept 2026 View ↗ PDF 10 low voltage switchroom #2 proposed elevations Proposed Elevations · 28 Sept 2026 View ↗ PDF 09 low voltage switchroom #2 proposed ground floor & roof plan Proposed Floor Plans · 28 Sept 2026 View ↗ PDF 06 switch #1 proposed ground floor & roof plan Proposed Floor Plans · 28 Sept 2026 View ↗

All documents on the council site ↗

Work with planning data?

Every application in Newry Mourne Down - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full
Received
23 Sept 2026
Validated
28 Sept 2026
Ward
Ballybot
Applicant
Show
Agent
Tetra Tech Consulting (NI) Ltd

Decision outlook

Day 11 of the 56-day target. Newry Mourne Down usually decides full applications by day 111.

Day 11100 days to the predicted decision (day 111)
17%decided within 8 weeks
100%approved
44decided in the last year

Plota live figures for full applications decided by Newry Mourne Down in the last twelve months, from validation. Newry Mourne Down decision record →

Consultation & key dates

Planning Portal ref
PP-15076813
Comments by
28 Oct 2026
Site or press notice
14 Oct 2026