26/01537/LBC - Listed Building Consent Registered

Proposal

Listed Building Consent for proposed refurbishment of staff mess/toilets Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Nov 2026
Decision
Expected by 30 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 30 Dec 2026, from Isle of Wight's recent listed building works.

Comments are open until 11 Dec 2026

Comment on this application ↗

Documents 20

All documents on the council site ↗

Site constraints 5

Grade II listed: Shanklin Railway Station
List entry 1365375 · 9 m away
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Also on the record
Local nature reserve 382 m away: Sibden Hill and Batts Copse; Radon affected area, class 2; Inside the Shanklin built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area10 m² (108 sq ft)
Energy ratingE (asset rating 104)
UseA1/A2 Retail and Financial/Professional services
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in March 2019, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Isle of Wight - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent
Postcode
PO37 7AR
Received
4 Nov 2026
Validated
4 Nov 2026
Ward
Shanklin Central
Parish
Shanklin
Case officer
Show
Applicant
Show
Agent
KVB Architects Ltd

Decision outlook

Day 19 of the 56-day target. Isle of Wight usually decides listed building works by day 56.

Day 1937 days to the 56-day target
86%decided within 8 weeks
97%approved
64decided in the last year

Plota live figures for listed building works decided by Isle of Wight in the last twelve months, from validation. Isle of Wight decision record →

Public comments

No public comments yet.

Last counted 19 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15336027
Planning Portal ref
PP-15336027
Comments by
11 Dec 2026
Statutory expiry
30 Dec 2026
Env. assessment
No
Isle of Wight
Planning Authority Score
8.9/10
Excellent
#7 of 296 overall
Relevant to this application:
Other decisions

Isle of Wight is one of the fastest councils in England for householder decisions: #11 of 296 on speed. Only 15% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Isle of Wight decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #84 of 296
95%
Householder approved
Above avg (90%) #81 of 296
92%
Decided in 8 weeks
Above avg (63%) #11 of 296
15%
Extended time limit
Below avg (41%) #11 of 296
84%
Minor dwellings approved
144 decided (1-9 homes)
67%
Major dwellings approved
18 decided (10+ homes)
94%
Change of use approved
34 decided
792
Total decisions
63 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.