Cider Mill Cottage Whitehall Road Hampton Bishop Hereford Herefordshire HR1 4LA Data via plota.co.uk

P260730/FH - Full Householder Approved

Proposal

Works to include single storey rear extension, remodel and renovation. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
10 Mar 2026
✓
Validated
1 Apr 2026
✓
Approved
22 Jun 2026

Approved on 22 Jun 2026 · Last checked 23 Sept 2026

Site constraints 12

Grade II listed: Group of Two Pedestal Tombs Approximately 20 Metres South-West of Church of St Andrew
List entry 1099871 · 18 m away · 11 more listed buildings within 150 m (1 Grade I, 1 Grade II*, 9 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 11 with distances
Historic England ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Nutrient neutrality catchment: River Wye SAC (River Lugg SSSI)
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Hampton Bishop conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Public footpath 20 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Scheduled monument 39 m away: Churchyard cross in St Andrew's churchyard
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2; Special area of conservation 446 m away: River Wye / Afon Gwy (England); SSSI 455 m away: River Lugg SSSI; Inside the Hampton Bishop built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £440,000 in September 2025. Detached house, freehold.

2 September 2025£440,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in Herefordshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Householder
Postcode
HR1 4LA
Received
10 Mar 2026
Validated
1 Apr 2026
Ward
Backbury
Parish
Hampton Bishop
Target decision
22 Jun 2026
Decision
Approved with Conditions
Decision date
22 Jun 2026

How this decision compares

Decided in 82 days from validation, 26 days slower than Herefordshire's median of 56 for extensions. Approved, as 98% of extensions here are.

58%decided within 8 weeks
98%approved
440decided in the last year

Plota live figures for extensions decided by Herefordshire in the last twelve months, from validation. Herefordshire decision record →

Consultation & key dates

Consultation
8 Apr 2026
Comments by
7 May 2026
Site or press notice
8 Apr 2026
Herefordshire
Planning Authority Score
3.3/10
Poor
#224 of 296 councils
Relevant to this application:
Householder decisions

Herefordshire is slower than most councils at deciding householder applications, ranking #250 out of 296. The council extends the time limit on 60% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Herefordshire decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #56 of 296
95%
Householder approved
Above avg (90%) #79 of 296
46%
Decided in 8 weeks
Below avg (63%) #250 of 296
60%
Extended time limit
Above avg (41%) #269 of 296
89%
Minor dwellings approved
278 decided (1-9 homes)
67%
Major dwellings approved
18 decided (10+ homes)
92%
Change of use approved
104 decided
1,406
Total decisions
96 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.