Land adjacent to Mountside , Slade Lane, Dosthill, Tamworth, Staffordshire, B77 1LX Data via plota.co.uk

0225/2026 - Full REGISTERED

Proposal

8 no. residential dwellings with associated car parking and landscaping Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
21 Sept 2026
✓
Validated
24 Sept 2026
Decision
Expected by 16 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 4 Dec 2026 and 11 Dec 2026, from Tamworth's recent full applications.

Comments are open until 15 Oct 2026

Comment on this application ↗

Site constraints 6

Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 4; Coalfield, development low risk area; Inside the Tamworth built-up area; Green belt about 18 m away: Birmingham; Priority habitat about 46 m away: Good quality semi improved grassland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tamworth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Tamworth
Application type
Full
Postcode
B77 1LX
Received
21 Sept 2026
Validated
24 Sept 2026
Ward
Trinity
Case officer
Show
Target decision
16 Nov 2026
Applicant
Show

Decision outlook

Day 15 of the 56-day target. Tamworth usually decides full applications by day 78.

Day 1563 days to the predicted decision (day 78)
21%decided within 8 weeks
93%approved
14%go to committee

Plota live figures for full applications decided by Tamworth in the last twelve months, from validation. Tamworth decision record →

Consultation & key dates

Comments by
15 Oct 2026
Tamworth
Planning Authority Score
4.4/10
Below average
#184 of 296 councils
Relevant to this application:
Householder decisions

Tamworth is slower than most councils at deciding householder applications, ranking #222 out of 296. The council extends the time limit on 59% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Tamworth decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #30 of 296
99%
Householder approved
Above avg (90%) #8 of 296
53%
Decided in 8 weeks
Below avg (63%) #222 of 296
59%
Extended time limit
Above avg (41%) #266 of 296
67%
Minor dwellings approved
9 decided (1-9 homes)
100%
Major dwellings approved
2 decided (10+ homes)
83%
Change of use approved
18 decided
150
Total decisions
8 refused in the year to March 2026