B And W Nurseries, Salisbury Road, Plaitford, Romsey SO51 6EE Data via plota.co.uk

26/00915FULL - Major - Non EIA Pending Decision

Proposal

Erection of 2no. buildings for commercial and business uses (Use Classes E (g)(i) - office, E(g)(ii) research and development of products and processes, E(g)(iii) industrial processes and ancillary use Classes E(d) indoor sport, recreation or fitness and E(f) creche, day nursery or day centre excluding residential use of the Town and Country (Use Classes) Order 1987 (As amended)); associated - hard and soft landscaping, drainage infrastructure; demolition of 7no. buildings Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
21 Aug 2026
✓
Consultation
10 Sept 2026
✓
Validated
15 Sept 2026
Decision
Expected by 10 Dec 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 69.

The consultation period closed on 25 Oct 2026.

Documents 76

Plans & drawings 52

PDF Building A Proposed North & South Elevations Drawing · 11 Sept 2026 View ↗ PDF Building A Proposed East & West Elevations Drawing · 11 Sept 2026 View ↗ PDF Building A Proposed Sections 1 & 2 Drawing · 11 Sept 2026 View ↗ PDF Building A Proposed Sections 3, 4, 5, & 6 Drawing · 11 Sept 2026 View ↗ PDF Building B Proposed Ground Floor Plan Drawing · 11 Sept 2026 View ↗ PDF Building B Proposed Elevations Drawing · 11 Sept 2026 View ↗ PDF Building B Proposed Sections X & Y Drawing · 11 Sept 2026 View ↗ PDF Greenhouse 1 Existing Elevations Drawing · 11 Sept 2026 View ↗ PDF Greenhouse 1 Existing Floor Plan Drawing · 11 Sept 2026 View ↗ PDF Greenhouse 2 Existing Elevations Drawing · 11 Sept 2026 View ↗ PDF Greenhouse 2 Existing Floor Plans Drawing · 11 Sept 2026 View ↗ PDF Greenhouse 3 Existing Elevations Drawing · 11 Sept 2026 View ↗ PDF Greenhouse 3 Existing Floor Plans Drawing · 11 Sept 2026 View ↗ PDF Outbuilding Existing Elevations & Floor Plan Drawing · 11 Sept 2026 View ↗ PDF Store Existing Elevations & Floor Plan Drawing · 11 Sept 2026 View ↗ PDF Workshop Existing Elevations & Floor Plan Drawing · 11 Sept 2026 View ↗ PDF W.C. Existing Elevations & Floor Plan Drawing · 11 Sept 2026 View ↗ PDF Covering Letter & Drawing List BackGround Papers · 27 Aug 2026 View ↗ PDF Proposed Site Section 2 Drawing · 21 Aug 2026 View ↗ PDF Fire Service Access Strategy Drawing · 21 Aug 2026 View ↗ PDF Proposed Gross Internal Area Plan Drawing · 21 Aug 2026 View ↗ PDF Proposed Block Plan Drawing · 21 Aug 2026 View ↗ PDF Waste Strategy Drawing · 21 Aug 2026 View ↗ PDF Access Strategy Drawing · 21 Aug 2026 View ↗ PDF Proposed Site Section 1 Drawing · 21 Aug 2026 View ↗ PDF Demolition Plan Drawing · 21 Aug 2026 View ↗ PDF Existing Site Elevation 2 Drawing · 21 Aug 2026 View ↗ PDF Existing Site Section 1 Drawing · 21 Aug 2026 View ↗ PDF Existing Block Plan Drawing · 21 Aug 2026 View ↗ PDF Location Plan Drawing · 21 Aug 2026 View ↗ PDF Building B Proposed Roof Plan Drawing · 21 Aug 2026 View ↗ PDF Building A1 Proposed Ground Floor Plan Drawing · 21 Aug 2026 View ↗ PDF Building A2 Proposed Roof Plan Drawing · 21 Aug 2026 View ↗ PDF Building A1 Proposed Roof Plan Drawing · 21 Aug 2026 View ↗ PDF Building A2 Proposed Ground Floor Plan Drawing · 21 Aug 2026 View ↗ PDF Building A1 Proposed First Floor Plan Drawing · 21 Aug 2026 View ↗ PDF Proposed Gross External Area Plan Drawing · 21 Aug 2026 View ↗ PDF Construction Environment Management Plan BackGround Papers · 21 Aug 2026 View ↗ PDF Site Access with Highway Boundary Plan Drawing · 21 Aug 2026 View ↗ PDF Travel Plan BackGround Papers · 21 Aug 2026 View ↗ PDF Potential A36 Site Access Plan Drawing · 21 Aug 2026 View ↗ PDF Swept Path Analysis - Refuse Collection Vehicle Drawing · 21 Aug 2026 View ↗ PDF Swept Path Analysis - 10m Rigid Vehicle Drawing · 21 Aug 2026 View ↗ PDF Swept Path Analysis - Large Panel Van / Estate Car Drawing · 21 Aug 2026 View ↗ PDF Swept Path Analysis - Fire Appliance Drawing · 21 Aug 2026 View ↗ PDF Tree Pit Section Drawing · 21 Aug 2026 View ↗ PDF Hard Landscaping Plan Drawing · 21 Aug 2026 View ↗ PDF Soft Landscaping plan Drawing · 21 Aug 2026 View ↗ PDF Typical Crib Wall Section Drawing · 21 Aug 2026 View ↗ PDF Proposed Landscaping Masterplan Drawing · 21 Aug 2026 View ↗ PDF Horizontal Illuminance Plan Drawing · 21 Aug 2026 View ↗ PDF Tree Protection Plan Drawing · 21 Aug 2026 View ↗

All documents on the council site ↗

Site constraints 11

Surface water flood riskAerodrome safeguarding zoneUnexploded ordnance risk
Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
New Forest National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
2 Article 4 directions
Article 4 Direction Np New Forest Campsite · Article 4 Direction Np New Forest Recreational Campsite. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Priority habitat: Deciduous woodland
A habitat of principal importance. It shapes the ecology work and the biodiversity net gain a scheme has to show.
Special area of conservation 60 m away: The New Forest
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
SSSI 60 m away: The New Forest SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Habitat network: Other Priority Habitats - NEZ
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Surface water flood riskCouncil record
Recorded by the council for this site.
Council site ↗
Aerodrome safeguarding zoneCouncil record
Recorded by the council for this site.
Council site ↗
Unexploded ordnance riskCouncil record
Recorded by the council for this site.
Council site ↗
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £750,000 in February 2023. Other property, freehold.

24 February 2023£750,000Recorded as a transfer outside a standard sale

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in New Forest (Park) - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Major - Non EIA
Postcode
SO51 6EE
Received
21 Aug 2026
Validated
15 Sept 2026
Parish
Melchet Park and Plaitford Parish Council
Case officer
Show
Target decision
10 Dec 2026
Applicant
Show
Agent
tor&co
Freehold owner
Show

Decision outlook

Day 69, past the statutory target. 92% of commercial and major works in New Forest (Park) are decided within thirteen weeks, which runs to 15 Dec 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 21 Nov 2026.

Day 6913 days past the 56-day target
77%decided within 8 weeks
85%approved
50%go to committee

Plota live figures for commercial and major works decided by New Forest (Park) in the last twelve months, from validation. New Forest (Park) decision record →

Consultation & key dates

Alt. reference
PP-14980991
Comments by
25 Oct 2026
Site or press notice
10 Sept 2026
New Forest (Park)
Planning Authority Score
3.3/10
Poor
#226 of 296 overall
Relevant to this application:
Major dwellings

New Forest (Park) is slower than most councils at deciding householder applications: #254 of 296 on speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
New Forest (Park) decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #136 of 296
92%
Householder approved
Above avg (90%) #160 of 296
45%
Decided in 8 weeks
Below avg (63%) #254 of 296
44%
Extended time limit
Above avg (41%) #180 of 296
75%
Minor dwellings approved
28 decided (1-9 homes)
50%
Major dwellings approved
4 decided (10+ homes)
83%
Change of use approved
18 decided
487
Total decisions
55 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold owner: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.