Central Electricity Generating Board Calow Lane Calow Chesterfield S44 5XH Data via plota.co.uk

26/00677/DISCON pending

Proposal

Application to discharge conditions 3 (construction environmental management plan), 6 (site waste management plan), 7 (habitat management and monitoring plan) and 20 (construction surface water management) pursuant to planning application 25/01062/MFL Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
1 Sept 2026
Decision
Expected by 27 Oct 2026

This application is under consideration - no decision has been issued yet. A decision is expected by 27 Oct 2026.

Documents 25

Plans & drawings 15

PDF FIGURE 02 CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN DESIGNATED AND NON- DESIGNA Drawing · 1 Sept 2026 View ↗ PDF FIGURE 04 CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN POND LOCATION MAP CHESTERFI Drawing · 1 Sept 2026 View ↗ PDF FIGURE 01 CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN CONSENTED SCHEME LOCATION: Drawing · 1 Sept 2026 View ↗ PDF FIGURE 03 CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN PHASE 1 HABITAT PLAN CHESTE Drawing · 1 Sept 2026 View ↗ PDF FIGURE 10 CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN BEDROCK GEOLOGY CHESTERFIEL Drawing · 1 Sept 2026 View ↗ PDF FIGURE 05 CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN BAT PRF TREE LOCATIONS: CHE Drawing · 1 Sept 2026 View ↗ PDF FIGURE 06 CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN BASELINE HABITAT MAP: CHEST Drawing · 1 Sept 2026 View ↗ PDF FIGURE 09 CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN SUPERFICIAL GEOLOGY Drawing · 1 Sept 2026 View ↗ PDF FIGURE 07 CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN PUBLIC ACCESS: CHESTERFIELD Drawing · 1 Sept 2026 View ↗ PDF HABITAT MANAGEMENT AND MONITORING PLAN Supporting Document · 1 Sept 2026 View ↗ PDF HABITAT MANAGEMENT AND MONITORING PLAN Supporting Document · 1 Sept 2026 View ↗ PDF CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN Supporting Document · 1 Sept 2026 View ↗ PDF CONSTRUCTION SURFACE WATER MANAGEMENT PLAN Supporting Document · 1 Sept 2026 View ↗ PDF DUST MANAGEMENT PLAN Supporting Document · 1 Sept 2026 View ↗ PDF SITE WASTE MANAGEMENT PLAN Supporting Document · 1 Sept 2026 View ↗

All documents on the council site ↗

Associated applications 4

Site constraints 1

Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Predicted from the national soil map. The older provisional map agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North East Derbyshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Postcode
S44 5XH
Received
1 Sept 2026
Validated
1 Sept 2026

Consultation & key dates

Alt. reference
PP-15186097
North East Derbyshire
Planning Authority Score
4.6/10
Below average
#168 of 296 councils
Relevant to this application:
Householder decisions

North East Derbyshire ranks #166 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
North East Derbyshire decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #89 of 296
93%
Householder approved
Above avg (90%) #133 of 296
62%
Decided in 8 weeks
Below avg (63%) #166 of 296
44%
Extended time limit
Above avg (41%) #181 of 296
87%
Minor dwellings approved
45 decided (1-9 homes)
100%
Major dwellings approved
8 decided (10+ homes)
82%
Change of use approved
28 decided
532
Total decisions
42 refused in the year to March 2026