Teviot Estate, London, E14 6QU Data via plota.co.uk

PA/26/01786/S - Approval Reserved Matters (After OPP) Registered

Proposal

Application for approval of Reserved Matters (appearance, layout, means of access and landscaping) in relation to Phase 1b (Langdon Park) pursuant to Condition 3 of Outline Planning Permission dated 10/12/2025 () Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 10 Nov 2026
Decision
Expected by 2 Mar 2027

Under consideration

No decision has been issued yet. A decision is expected by 2 Mar 2027.

Documents 50

Plans & drawings 25

PDF Drawing/Document Issue Register Drawing/Document Issue Register · 21 Oct 2026 View ↗ PDF TVES-OUT-XX-XX-D-L-90408 P01 PLANTING PLAN SHEET 9 OF 9 Correspondence · 21 Oct 2026 View ↗ PDF TVES-OUT-XX-XX-D-L-90407 P01 PLANTING PLAN SHEET 8 OF 9 Correspondence · 21 Oct 2026 View ↗ PDF TVES-OUT-XX-XX-D-L-90406 P01 PLANTING PLAN SHEET 7 OF 9 Correspondence · 21 Oct 2026 View ↗ PDF TVES-OUT-XX-XX-D-L-90405 P01 PLANTING PLAN SHEET 6 OF 9 Correspondence · 21 Oct 2026 View ↗ PDF TVES-OUT-XX-XX-D-L-90404 P01 PLANTING PLAN SHEET 5 OF 9 Correspondence · 21 Oct 2026 View ↗ PDF TVES-OUT-XX-XX-D-L-90403 P01 PLANTING PLAN SHEET 4 OF 9 Correspondence · 21 Oct 2026 View ↗ PDF TVES-OUT-XX-XX-D-L-90402 P01 PLANTING PLAN SHEET 3 OF 9 Correspondence · 21 Oct 2026 View ↗ PDF TVES-OUT-XX-XX-D-L-90401 P01 PLANTING PLAN SHEET 2 OF 9 Correspondence · 21 Oct 2026 View ↗ PDF TVES-OUT-XX-XX-D-L-90400 P01 PLANTING PLAN SHEET 1 OF 9 Correspondence · 21 Oct 2026 View ↗ PDF TVES-OUT-XX-XX-D-L-90208 P01 HARDWORKS PLAN SHEET 9 OF 9 Correspondence · 21 Oct 2026 View ↗ PDF TVES-OUT-XX-XX-D-L-90208 P01 HARDWORKS PLAN SHEET 9 OF 9 Correspondence · 21 Oct 2026 View ↗ PDF TVES-OUT-XX-XX-D-L-90207 P01 HARDWORKS PLAN SHEET 8 OF 9 Correspondence · 21 Oct 2026 View ↗ PDF TVES-OUT-XX-XX-D-L-90206 P01 HARDWORKS PLAN SHEET 7 OF 9 Correspondence · 21 Oct 2026 View ↗ PDF TVES-OUT-XX-XX-D-L-90205 P01 HARDWORKS PLAN SHEET 6 OF 9 Correspondence · 21 Oct 2026 View ↗ PDF TVES-OUT-XX-XX-D-L-90204 P01 HARDWORKS PLAN SHEET 5 OF 9 Correspondence · 21 Oct 2026 View ↗ PDF TVES-OUT-XX-XX-D-L-90203 P01 HARDWORKS PLAN SHEET 4 OF 9 Correspondence · 21 Oct 2026 View ↗ PDF TVES-OUT-XX-XX-D-L-90202 P01 HARDWORKS PLAN SHEET 3 OF 9 Correspondence · 21 Oct 2026 View ↗ PDF TVES-OUT-XX-XX-D-L-90201 P01 HARDWORKS PLAN SHEET 2 OF 9 Correspondence · 21 Oct 2026 View ↗ PDF TVES-OUT-XX-XX-D-L-90200 P01 HARDWORKS PLAN SHEET 1 OF 9 Correspondence · 21 Oct 2026 View ↗ PDF TVES-OUT-XX-XX-D-L-90100 P01 LANDSCAPE GENERAL ARRANGEMENT PLAN Correspondence · 21 Oct 2026 View ↗ PDF BASELINE HABITAT MAP Current Plan · 21 Oct 2026 View ↗ PDF POST DEVELOPMENT HABITAT MAP Current Plan · 21 Oct 2026 View ↗ PDF 132-15-S38-CD-A REV A LIGHTING FOR THE PARK AND OPEN SPACE TO LPA SPEC AND RELEVANT STANDARDS P3 FOR MAIN PATHS AND P5 FOR SECONDARY PATHS AND PLAY SPACES Current Plan · 20 Oct 2026 View ↗ PDF TVES-BPTW-ZZ-ZZ-D-A-0247 C01 SITE LOCATION PLAN Current Plan · 20 Oct 2026 View ↗

All documents on the council site ↗

Site constraints 9

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: Silvertown Tunnel (decided, 1903 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Archaeological priority area: Tower Hamlets APA 3.2
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Conservation area 7 m away: Langdon Park
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Also on the record
1 listed building within 150 m; Inside the Tower Hamlets built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square; Designated open space 15 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 17 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Approval Reserved Matters (After OPP)
Postcode
E14 6QP
Received
around 10 Nov 2026
Validated
10 Nov 2026
Ward
Lansbury
Case officer
Show
Target decision
2 Mar 2027
Decision level
Strategic Development Committee
Applicant
Show
Agent
Savills

Consultation & key dates

Statutory expiry
2 Mar 2027
Env. assessment
Yes
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 councils
Relevant to this application:
Major dwellings

Tower Hamlets is slower than most councils at deciding householder applications, ranking #207 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use