The Warren Cedar Road Cobham Surrey KT11 2AE Data via plota.co.uk

2026/1457 - Confirmation of Compliance with Conditions Approved

Proposal

Confirmation of Compliance with Conditions: 3 (Materials samples), 6 (Ecological Enhancement Plan) and 7 (Constuction Environmental Management Plan) of planning permission 2025/2390 allowed at appeal. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
16 Jun 2026
✓
Validated
18 Jun 2026
✓
Approved
6 Aug 2026

Approved on 6 Aug 2026 · Last checked 24 Sept 2026

Associated applications 3

Site constraints 8

5 listed buildings within 150 m of the postcode pin
Nearest: Gate Piers and Railings to Cedar House, Grade II, about 24 m from the postcode pin · 2 Grade II*, 3 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 5 with distances
Historic England ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Cobham conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
National infrastructure project about 1.5 km away: M25 junction 10/A3 Wisley interchange improvement; Flood defence about 3 m from the postcode pin (natural high ground, designed for a 1 in 5 year flood); Green belt about 0 m away: London; Inside the Cobham (Elmbridge) built-up area.
Not affected
No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £1,340,000 in July 2025. Detached house, freehold.

10 July 2025£1,340,000Recorded as a transfer outside a standard sale

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in Elmbridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Elmbridge
Application type
Confirmation of Compliance with Conditions
Postcode
KT11 2AE
Received
16 Jun 2026
Validated
18 Jun 2026
Ward
Cobham and Downside Ward
Decision
Condition(s) - Confirm Compliance
Decision date
6 Aug 2026
Freehold owner
Show
Elmbridge
Planning Authority Score
2.6/10
Poor
#247 of 296 overall
Relevant to this application:
Householder decisions

Elmbridge is #195 of 296 councils on householder decision speed. Elmbridge is also one of the strictest councils - it refuses more householder applications than almost any other, with only 79% approved vs 90% nationally.

One of the strictest councils
only 79% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Elmbridge decision statistics
Based on MHCLG data, the year to March 2026
77%
Overall approval rate
Below avg (87%) #277 of 296
79%
Householder approved
Below avg (90%) #281 of 296
57%
Decided in 8 weeks
Below avg (63%) #195 of 296
44%
Extended time limit
Above avg (41%) #178 of 296
68%
Minor dwellings approved
195 decided (1-9 homes)
60%
Major dwellings approved
15 decided (10+ homes)
72%
Change of use approved
32 decided
1,358
Total decisions
314 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold owner: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.