Land Rear Of, 46 Maple Leaf Business Park, Monkton, Ramsgate, Kent, CT12 5GD Data via plota.co.uk

F/TH/26/0968 - Full Planning Permission Pending Consideration

Proposal

Erection of 1No. industrial unit (Use Class B8) (part-retrospective) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
21 Sept 2026
✓
Validated
23 Sept 2026
Decision
Expected by 9 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 22 Dec 2026 and 6 Jan 2027, from Thanet's recent commercial and major works.

Site constraints 3

Article 4 direction
Birchington & Rural ED. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
National infrastructure project 353 m away: Manston Airport
The site is 353 m from the project boundary. Airport, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Minster (Thanet) built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Thanet - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Thanet
Application type
Full Planning Permission
Postcode
CT12 5GD
Received
21 Sept 2026
Validated
23 Sept 2026
Ward
Thanet Villages
Parish
Minster Parish Council
Case officer
Show
Target decision
9 Dec 2026
Decision level
Delegated decision
Applicant
Show
Agent
Urban Surveying & Design LTD

Decision outlook

Day 61 of the 56-day target. Thanet usually decides commercial and major works by day 97.

Day 6136 days to the predicted decision (day 97)
19%decided within 8 weeks
100%approved
30%go to committee

Plota live figures for commercial and major works decided by Thanet in the last twelve months, from validation. Thanet decision record →

Consultation & key dates

Statutory expiry
9 Dec 2026
Thanet
Planning Authority Score
4.5/10
Below average
#175 of 296 overall
Relevant to this application:
Householder decisions

Thanet is #171 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Thanet decision statistics
Based on MHCLG data, the year to March 2026
91%
Overall approval rate
Above avg (87%) #103 of 296
94%
Householder approved
Above avg (90%) #122 of 296
62%
Decided in 8 weeks
Below avg (63%) #171 of 296
45%
Extended time limit
Above avg (41%) #196 of 296
79%
Minor dwellings approved
105 decided (1-9 homes)
85%
Major dwellings approved
27 decided (10+ homes)
90%
Change of use approved
50 decided
751
Total decisions
67 refused in the year to March 2026