Outside Of 21 Bolton Street Denaby Main Doncaster DN12 4UG Data via plota.co.uk

26/02155/PDTEL - PD Telecommunications Decided

Proposal

The electronic communications code (conditions and restrictions) regulations 2003 (as amended) regulation 5 notice of intention to install fixed line broadband apparatus - Installation of 1 x 10 light wooden pole (Ref OGEAA8021415) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Nov 2026
Decision
Expected by 9 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 26 Dec 2026 and 5 Jan 2027, from Doncaster's recent utility and infrastructure works.

Site constraints 5

Also on the record
Radon affected area, class 2; Nature improvement area: Dearne Valley Green Heart; National infrastructure project 1.8 km away: Whitestone Solar Farm; Coalfield, development low risk area; Inside the Denaby Main built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 14 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Doncaster - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Doncaster
Application type
PD Telecommunications
Postcode
DN12 4UG
Received
11 Nov 2026
Validated
11 Nov 2026
Ward
Conisbrough
Case officer
Show
Target decision
9 Dec 2026
Applicant
Show
Agent
Renuka Govindaraj - Openreach

Decision outlook

Day 12 of the 56-day target. Doncaster usually decides utility and infrastructure works by day 48.

Day 1244 days to the 56-day target
65%decided within 8 weeks
91%approved
59decided in the last year

Plota live figures for utility and infrastructure works decided by Doncaster in the last twelve months, from validation. Doncaster decision record →

Public comments

No public comments yet.

Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
9 Dec 2026
Env. assessment
No
Doncaster
Planning Authority Score
7.7/10
Good
#36 of 296 overall
Relevant to this application:
Householder decisions

Doncaster is one of the fastest councils in England for householder decisions: #27 of 296 on speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Doncaster decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #169 of 296
94%
Householder approved
Above avg (90%) #103 of 296
83%
Decided in 8 weeks
Above avg (63%) #27 of 296
33%
Extended time limit
Below avg (41%) #75 of 296
67%
Minor dwellings approved
135 decided (1-9 homes)
93%
Major dwellings approved
27 decided (10+ homes)
90%
Change of use approved
48 decided
928
Total decisions
122 refused in the year to March 2026