DM/26/01811/FPA - Full Planning Application Approved

Proposal

Installation of plant equipment on the existing roof plant deck and externally along the Department Of Biosciences including 2no surface mounted cooling units, 1no floor standing electrical GRP enclosure, DX unit, air handling unit, external louvred penetrations, flue extract and extract fan, galvanised steel ductwork and surface mounted containment ladder rack. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 Jul 2026
✓
Validated
24 Jul 2026
✓
Consultation
28 Jul 2026
✓
Approved
18 Sept 2026

Approved on 18 Sept 2026 · Fast Track · Last checked 19 Sept 2026

Site constraints 6

Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment.
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
Also on the record
Radon affected area, class 2; Inside the Durham built-up area; Green belt 43 m away: Tyne and Wear; Priority habitat 43 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Durham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Durham
Application type
Full Planning Application
Postcode
DH1 3LE
Received
14 Jul 2026
Validated
24 Jul 2026
Ward
Neville's Cross
Parish
City Of Durham
Case officer
Show
Target decision
18 Sept 2026
Decision
Approved BNG Not Required
Decision date
18 Sept 2026
Decision level
Fast Track
Applicant
Show
Agent
Ryder Architecture

How this decision compares

Decided in 56 days from validation, about the council's usual 56 days. Approved, as 92% of utility and infrastructure works here are.

63%decided within 8 weeks
92%approved
67decided in the last year

Plota live figures for utility and infrastructure works decided by Durham in the last twelve months, from validation. Durham decision record →

Public comments

No public comments yet.

Last counted 19 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15063683
Planning Portal ref
PP-15063683
Consultation
28 Jul 2026
Comments by
27 Aug 2026
Site or press notice
6 Aug 2026
Statutory expiry
18 Sept 2026
Env. assessment
No
Durham
Planning Authority Score
5.2/10
Average
#137 of 296 councils
Relevant to this application:
Householder decisions

Durham ranks #190 out of 296 councils for householder decision speed. 48% of applications have the time limit extended, above the 41% national average. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Durham decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #52 of 296
97%
Householder approved
Above avg (90%) #29 of 296
59%
Decided in 8 weeks
Below avg (63%) #190 of 296
48%
Extended time limit
Above avg (41%) #213 of 296
79%
Minor dwellings approved
95 decided (1-9 homes)
90%
Major dwellings approved
49 decided (10+ homes)
87%
Change of use approved
201 decided
1,706
Total decisions
113 refused in the year to March 2026