Street Record, Ealing Road, Wembley Data via plota.co.uk

26/2783 - Full Planning Permission Registered

Proposal

Installation of street hub outside 1-59, Grand Union House, 257 Ealing Road, Wembley, HA0 1GH Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Nov 2026
Decision
Expected by 28 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 28 Dec 2026, from Brent's recent utility and infrastructure works.

Documents 24

All documents on the council site ↗

Site constraints 6

Article 4 direction
Article 4 for HMOs. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Brent AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Ealing Road
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Also on the record
Inside the Brent built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 5 November 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Brent - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Brent
Application type
Full Planning Permission
Received
2 Nov 2026
Validated
2 Nov 2026
Ward
Wembley Central
Case officer
Show
Target decision
28 Dec 2026
Decision level
Delegated Team Manager
Applicant
Show
Agent
Dalcour Maclaren

Decision outlook

Day 9 of the 56-day target. Brent usually decides utility and infrastructure works by day 56.

Day 947 days to the 56-day target
76%decided within 8 weeks
83%approved
64decided in the last year

Plota live figures for utility and infrastructure works decided by Brent in the last twelve months, from validation. Brent decision record →

Public comments

No public comments yet.

Last counted 5 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15326003
Planning Portal ref
PP-15326003
Env. assessment
No
Brent
Planning Authority Score
5.7/10
Average
#113 of 296 councils
Relevant to this application:
Householder decisions

Brent is faster than most councils at deciding householder applications, ranking #91 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly less likely to be approved here (85%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Brent decision statistics
Based on MHCLG data, the year to March 2026
78%
Overall approval rate
Below avg (87%) #269 of 296
85%
Householder approved
Below avg (90%) #247 of 296
73%
Decided in 8 weeks
Above avg (63%) #91 of 296
28%
Extended time limit
Below avg (41%) #42 of 296
53%
Minor dwellings approved
73 decided (1-9 homes)
85%
Major dwellings approved
13 decided (10+ homes)
54%
Change of use approved
193 decided
1,963
Total decisions
431 refused in the year to March 2026