Bradbeers, 124-138 Station Road, New Milton BH25 6LW Data via plota.co.uk

25/10703 - Full Planning Permission Approved

Proposal

New entrance to front elevation; render to existing brickwork; raised parapet, change of windows to black frames; cladding to second floor; creation of roof terrace with balustrade; refurbishment of canopy and fenestration alterations Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
31 Jul 2025
✓
Validated
4 Aug 2025
✓
Consultation
5 Aug 2025
✓
Approved
9 Oct 2025

Approved on 9 Oct 2025 · Delegated · Last checked 4 Nov 2026

Documents 22

All documents on the council site ↗

Site constraints 4

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
National infrastructure project: Navitus Bay Wind Park
The site is inside the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 3; Inside the New Milton built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 4 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area2,386 m² (25,683 sq ft)
Energy ratingB (asset rating 32)
UseRetail/Financial and Professional Services
HeatingAir Conditioning

From the energy performance certificate lodged in March 2024, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in New Forest (District) - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
BH25 6LW
Received
31 Jul 2025
Validated
4 Aug 2025
Ward
Milton
Parish
New Milton
Case officer
Show
Target decision
17 Oct 2025
Decision
Granted Subject to Conditions
Decision date
9 Oct 2025
Decision level
Delegated
Applicant
Show
Agent
The Genesis Design Studio Ltd

How this decision compares

Decided in 66 days from validation, 13 days slower than New Forest (District)'s median of 53 for full applications. Approved, as 92% of full applications here are.

67%decided within 8 weeks
92%approved
746decided in the last year

Plota live figures for full applications decided by New Forest (District) in the last twelve months, from validation. New Forest (District) decision record →

Public comments

1comment received
1 objecting

5 neighbours consulted · Last counted 4 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14218474
Planning Portal ref
PP-14218474
Consultation
5 Aug 2025
Comments by
29 Aug 2025
Env. assessment
No
New Forest (District)
Planning Authority Score
7.8/10
Good
#29 of 296 councils
Relevant to this application:
Householder decisions

New Forest (District) is faster than most councils at deciding householder applications, ranking #37 out of 296. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
New Forest (District) decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #112 of 296
96%
Householder approved
Above avg (90%) #54 of 296
80%
Decided in 8 weeks
Above avg (63%) #37 of 296
35%
Extended time limit
Below avg (41%) #103 of 296
69%
Minor dwellings approved
87 decided (1-9 homes)
91%
Major dwellings approved
11 decided (10+ homes)
78%
Change of use approved
40 decided
885
Total decisions
85 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.