6, Woodside Gardens, Ashurst, Southampton SO40 7BY Data via plota.co.uk

26/00891FULL - Full Application Site Visit

Proposal

Loft conversion; Porch extension Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
14 Aug 2026
Consultation
14 Aug 2026
Validated
26 Aug 2026
Decision
Expected by 9 Oct 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision around 14 Oct 2026, from New Forest (Park)'s recent extensions. Comments are open until 18 Sept 2026.

Comment on this application ↗

Site constraints 10

Special protection areaAerodrome safeguarding zone0115/03
Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
New Forest National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
2 Article 4 directions
Article 4 Direction Np New Forest Campsite · Article 4 Direction Np New Forest Recreational Campsite. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI 177 m away: Fletchwood Meadows SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Special protection areaCouncil record
Recorded by the council for this site.
Council site ↗
Aerodrome safeguarding zoneCouncil record
Recorded by the council for this site.
Council site ↗
0115/03Council record
Recorded by the council for this site.
Council site ↗
Also on the record
Inside the Ashurst built-up area; the 1970s provisional farmland map had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in New Forest (Park) - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
SO40 7BY
Received
14 Aug 2026
Validated
26 Aug 2026
Parish
Ashurst and Colbury Parish Council
Case officer
Show
Target decision
9 Oct 2026
Applicant
Show

Decision outlook

Day 17 of the 56-day target. New Forest (Park) usually decides extensions by day 49.

Day 1739 days to the 56-day target
82%decided within 8 weeks
91%approved
83%go to committee

Plota live figures for extensions decided by New Forest (Park) in the last twelve months, from validation. New Forest (Park) decision record →

Consultation & key dates

Alt. reference
PP-15157788
Comments by
18 Sept 2026
Site or press notice
14 Aug 2026
New Forest (Park)
Planning Authority Score
3.3/10
Poor
#226 of 296 councils
Relevant to this application:
Householder decisions

New Forest (Park) is slower than most councils at deciding householder applications, ranking #254 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
New Forest (Park) decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #136 of 296
92%
Householder approved
Above avg (90%) #160 of 296
45%
Decided in 8 weeks
Below avg (63%) #254 of 296
44%
Extended time limit
Above avg (41%) #180 of 296
75%
Minor dwellings approved
28 decided (1-9 homes)
50%
Major dwellings approved
4 decided (10+ homes)
83%
Change of use approved
18 decided
487
Total decisions
55 refused in the year to March 2026