7 St Pauls Court, Stony Stratford, Milton Keynes, MK11 1LJ Data via plota.co.uk

PLN/2026/1670 - Listed building consent (alterations or extension) Under Consultation

Proposal

Listed building consent for retention of a raised stage area within restaurant area, a lightweight stud screening wall adjacent to toilet entrance, existing removal of internal entryway and existing removal of the partition walls to the hallway Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
1 Sept 2026
Decision
Expected by 29 Oct 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision around 27 Oct 2026, from Milton Keynes's recent listed building works.

Site constraints 6

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Stony Stratford conservation area
Also Stony Stratford. Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
2 Article 4 directions
Article 4 Direction relating to Houses in Multiple Occupation (HIMO) - Non immediate direction · Article 4 Direction relating to Houses in Multiple Occupation (HIMO) - Immediate direction. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Milton Keynes built-up area; the 1970s provisional farmland map had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Milton Keynes - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed building consent (alterations or extension)
Postcode
MK11 1LJ
Received
1 Sept 2026
Validated
1 Sept 2026
Ward
Stony Stratford
Parish
Stony Stratford
Case officer
Show
Target decision
29 Oct 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Enodia Planning Limited - Mr Nick Stafford

Decision outlook

Day 13 of the 56-day target. Milton Keynes usually decides listed building works by day 56.

Day 1343 days to the 56-day target
73%decided within 8 weeks
95%approved
39decided in the last year

Plota live figures for listed building works decided by Milton Keynes in the last twelve months, from validation. Milton Keynes decision record →

Public comments

No public comments yet.

Last counted 8 Sept 2026

Read the comments on the council site ↗

Milton Keynes
Planning Authority Score
7.1/10
Good
#59 of 296 councils
Relevant to this application:
Other decisions

Milton Keynes is faster than most councils at deciding householder applications, ranking #52 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Milton Keynes decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #156 of 296
92%
Householder approved
Above avg (90%) #159 of 296
78%
Decided in 8 weeks
Above avg (63%) #52 of 296
28%
Extended time limit
Below avg (41%) #45 of 296
55%
Minor dwellings approved
66 decided (1-9 homes)
83%
Major dwellings approved
23 decided (10+ homes)
71%
Change of use approved
49 decided
1,088
Total decisions
134 refused in the year to March 2026