Bottom Flat, Flat 2 And Top Flat Langholm Lodge Langholm DG13 0ND Data via plota.co.uk
Proposal
Installation of 31 replacement timber windows Data via plota.co.uk
Application progress
Under consideration
No decision has been issued yet. Plota predicted a decision soon after comments close on 3 Nov 2026; it is now day 97.
Documents 14
Plans & drawings 11
Application forms 1
Site constraints 2
Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Dumfries - and every UK council - as a live feed, an API, or a bulk CSV export.
Other new applications on this street
Important details
Decision outlook
Day 97, past the statutory target. 94% of extensions in Dumfries are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 20 Nov 2026.
Plota live figures for extensions decided by Dumfries in the last twelve months, from validation. Dumfries decision record →
Public comments
No public comments yet.
Last counted 20 Nov 2026
Consultation & key dates
- Alt. reference
- 100763001-001
- Comments by
- 3 Nov 2026
- Env. assessment
- No
Track this application
Bottom Flat, Flat 2 And Top Flat Langholm Lodge Langholm DG13 0ND
Tracking this application
Not there after a minute? Check your junk folder. It's from alerts@plota.co.uk.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.
The consultation period closed on 3 Nov 2026.