Verge at Fishguard Leisure Centre Car Park, Heol Dyfed, Fishguard, SA65 9DT Data via plota.co.uk
Description
Construction and operation of a micro energy storage project Data via plota.co.uk
Last checked
How this decision compares
Decided in 127 days from validation, 72 days slower than Pembrokeshire's median of 55 for full applications. Refused, as 18% of full applications here are.
Plota live figures for full applications decided by Pembrokeshire in the last twelve months, from validation. Pembrokeshire decision record →
Planning committee
Deferred by Pembrokeshire Planning Committee on 4 Nov 2025.
Deferred
- Officers advised approval because the facility would support low-carbon energy, fit the area and protect amenity and biodiversity.
- The Town Council, residents and the Local Member raised concerns about location, safety, fire, noise, visual impact and access.
- Members voted 9 to 4 for a site visit and deferred the application.
Source: Plota analysis of Pembrokeshire's committee minutes of 4 Nov 2025.
Site constraints 2
Checked on 1 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Pembrokeshire - and every UK council - as a live feed, an API, or a bulk CSV export.
Historical activity at this location
4 nearby applications on record - archival context, not part of the live application.